  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/grid/rfcm",
  "retrieved_at": "2026-10-30T08:26:43.998Z",
  "count": 25,
  "projects": [
    {
      "slug": "123net-llc-123net-dc1-24700-northwestern-hwy-southfield-mi",
      "name": "123NET Southfield Data Center Campus (DC1)",
      "summary": "123NET operates its flagship DC1 carrier neutral data center at 24700 Northwestern Highway in Southfield, Oakland County, Michigan.",
      "state": "MI",
      "city": "Southfield",
      "county": "Oakland County",
      "status": "operational",
      "developer": "123NET",
      "capacity_mw": 10,
      "latitude": 42.471634,
      "longitude": -83.238056,
      "location_precision": "address",
      "location_source": "https://www.123.net/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "123NET DC1 Southfield specification",
      "location_last_verified": null,
      "site_address": "24700 Northwestern Highway, Southfield, MI 48075",
      "site_address_source_url": "https://www.123.net/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.123.net/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/123net-llc-123net-dc1-24700-northwestern-hwy-southfield-mi",
      "source": "https://www.123.net/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "123NET Southfield Data Center Campus (DC1) Official Disclosure",
          "url": "https://www.123.net/data-centers/",
          "publisher": "123NET",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.123.net/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "365-data-centers-365-data-centers-detroit-dt1-southfield-mi",
      "name": "365 Data Centers Detroit (DT1)",
      "summary": "365 Data Centers operates the Detroit DT1 colocation data center at 24660 Lahser Road in Southfield, Oakland County, Michigan.",
      "state": "MI",
      "city": "Southfield",
      "county": "Oakland County",
      "status": "operational",
      "developer": "365 Data Centers",
      "capacity_mw": 4,
      "latitude": 42.469879,
      "longitude": -83.259651,
      "location_precision": "address",
      "location_source": "https://www.365datacenters.com/locations/detroit/",
      "location_verified_at": null,
      "coordinate_source": "365 Data Centers Detroit (DT1) specification",
      "location_last_verified": null,
      "site_address": "24660 Lahser Road, Southfield, MI 48033",
      "site_address_source_url": "https://www.365datacenters.com/locations/detroit/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.365datacenters.com/locations/detroit/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/365-data-centers-365-data-centers-detroit-dt1-southfield-mi",
      "source": "https://www.365datacenters.com/locations/detroit/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "365 Data Centers Detroit (DT1) Official Disclosure",
          "url": "https://www.365datacenters.com/locations/detroit/",
          "publisher": "365 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.365datacenters.com/locations/detroit/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "aunalytics-aunalytics-kalamazoo-datacenter-kalamazoo-mi",
      "name": "Aunalytics Kalamazoo Data Center",
      "summary": "Aunalytics operates a commercial cloud and colocation data center at 6395 Technology Avenue in Kalamazoo, Kalamazoo County, Michigan.",
      "state": "MI",
      "city": "Kalamazoo",
      "county": "Kalamazoo County",
      "status": "operational",
      "developer": "Aunalytics",
      "capacity_mw": 4,
      "latitude": 42.246545,
      "longitude": -85.675111,
      "location_precision": "address",
      "location_source": "https://aunalytics.com/",
      "location_verified_at": null,
      "coordinate_source": "Aunalytics Kalamazoo specification",
      "location_last_verified": null,
      "site_address": "6395 Technology Avenue, Kalamazoo, MI 49009",
      "site_address_source_url": "https://aunalytics.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aunalytics.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/aunalytics-aunalytics-kalamazoo-datacenter-kalamazoo-mi",
      "source": "https://aunalytics.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Aunalytics Kalamazoo Data Center Official Disclosure",
          "url": "https://aunalytics.com/",
          "publisher": "Aunalytics",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://aunalytics.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cmnrus-inc-dba-metronet-liquid-web-dc3-lansing-mi",
      "name": "Liquid Web Lansing Data Center (DC3)",
      "summary": "Liquid Web and Metronet operate the DC3 commercial data center at 2703 Ena Drive in Lansing, Eaton County, Michigan.",
      "state": "MI",
      "city": "Lansing",
      "county": "Eaton County",
      "status": "operational",
      "developer": "Liquid Web / Metronet",
      "capacity_mw": 10,
      "latitude": 42.705368,
      "longitude": -84.666064,
      "location_precision": "address",
      "location_source": "https://www.liquidweb.com/about-us/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "Liquid Web DC3 Lansing specification",
      "location_last_verified": null,
      "site_address": "2703 Ena Drive, Lansing, MI 48917",
      "site_address_source_url": "https://www.liquidweb.com/about-us/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.liquidweb.com/about-us/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cmnrus-inc-dba-metronet-liquid-web-dc3-lansing-mi",
      "source": "https://www.liquidweb.com/about-us/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Liquid Web Lansing Data Center (DC3) Official Disclosure",
          "url": "https://www.liquidweb.com/about-us/data-centers/",
          "publisher": "Liquid Web / Metronet",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.liquidweb.com/about-us/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "deep-green-downtown-lansing-data-center-mi",
      "name": "Deep Green Downtown Lansing Data Center",
      "summary": "Deep Green withdrew its proposal in April 2026 for an edge data center heat recovery facility in downtown Lansing, Ingham County, Michigan.",
      "state": "MI",
      "city": "Lansing",
      "county": "Ingham County",
      "status": "cancelled",
      "developer": "Deep Green",
      "capacity_mw": null,
      "latitude": 42.71434,
      "longitude": -84.56089,
      "location_precision": "parcel",
      "location_source": "https://www.lansingmi.gov/",
      "location_verified_at": null,
      "coordinate_source": "City of Lansing Deep Green proposal record",
      "location_last_verified": null,
      "site_address": "South Washington Avenue, Lansing, MI 48933",
      "site_address_source_url": "https://www.lansingmi.gov/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.lansingmi.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/deep-green-downtown-lansing-data-center-mi",
      "source": "https://planetdetroit.org/2026/07/warren-data-center-moratorium-power-outages/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center news: Warren weighs data center moratorium after storm exposes grid strain - Planet Detroit",
          "url": "https://planetdetroit.org/2026/07/warren-data-center-moratorium-power-outages/",
          "publisher": "Planet Detroit",
          "date": "2026-07-14",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-07-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Deep Green withdrew its downtown Lansing data center proposal in April 2026.",
          "source_url": "https://planetdetroit.org/2026/07/warren-data-center-moratorium-power-outages/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edgeconnex-detroit-holdings-llc-southfield-mi",
      "name": "EdgeConneX Detroit Data Center (DET01)",
      "summary": "EdgeConneX operates its Detroit DET01 commercial colocation data center at 21005 Lahser Road in Southfield, Oakland County, Michigan, registered under EPA FRS ID 110071133008.",
      "state": "MI",
      "city": "Southfield",
      "county": "Oakland County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": 8,
      "latitude": 42.44793,
      "longitude": -83.2596,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "EPA FRS 110071133008 and EdgeConneX DET01 specification",
      "location_last_verified": "2026-10-03",
      "site_address": "21005 Lahser Road, Southfield, MI 48033",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
      "published": "2026-10-03",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-detroit-holdings-llc-southfield-mi",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex Detroit Holdings LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071133008",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "google-van-buren-township-data-center-mi",
      "name": "Google Van Buren Township data center",
      "summary": "Google is developing a 1,000 megawatt hyperscale data center campus in Van Buren Township, Wayne County, Michigan, after Wayne County Commissioners approved project tax incentives in 2026.",
      "state": "MI",
      "city": "Van Buren Township",
      "county": "Wayne County",
      "status": "approved",
      "developer": "Google",
      "capacity_mw": 1000,
      "latitude": 42.2202069,
      "longitude": -83.4839342,
      "location_precision": "parcel",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Google Van Buren Township specification and Wayne County Commission approval record",
      "location_last_verified": "2026-09-14",
      "site_address": "Ecorse Road and Haggerty Road, Van Buren Township, MI 48111",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-van-buren-township-data-center-mi",
      "source": "https://datacenters.google/locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Wayne County commissioners override veto to approve Google data center tax incentives in Van Buren Township - WXYZ 7 News Detroit",
          "url": "https://www.wxyz.com/news/wayne-county-commissioners-override-veto-to-approve-google-data-center-tax-incentives-in-van-buren-township",
          "publisher": "WXYZ 7 News Detroit",
          "date": "2026-10-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": true,
          "source_date": "2026-10-02",
          "summary": "The Van Buren Township Planning Commission is expected to review the final site plan at its meeting on October 14",
          "source_url": "https://www.wxyz.com/news/wayne-county-commissioners-override-veto-to-approve-google-data-center-tax-incentives-in-van-buren-township",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Van Buren Township data center at Van Buren, Michigan on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "hyperscale-data-dowagiac-ai-data-center-mi",
      "name": "Hyperscale Data Dowagiac AI Data Center",
      "summary": "Hyperscale Data ceased cryptocurrency mining at its 617,000 square foot facility in Dowagiac, Cass County, Michigan in September 2026 and is converting the campus into a 52 megawatt AI data center.",
      "state": "MI",
      "city": "Dowagiac",
      "county": "Cass County",
      "status": "under_construction",
      "developer": "Hyperscale Data",
      "capacity_mw": 52,
      "latitude": 41.91167,
      "longitude": -86.01,
      "location_precision": "address",
      "location_source": "https://hyperscaledata.com/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Hyperscale Data Dowagiac facility specification",
      "location_last_verified": "2026-09-16",
      "site_address": "415 East Prairie Ronde Street, Dowagiac, MI 49047",
      "site_address_source_url": "https://hyperscaledata.com/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://hyperscaledata.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/hyperscale-data-dowagiac-ai-data-center-mi",
      "source": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "What's Going On With Hyperscale Data Stock Monday? - Hyperscale Data (AMEX:GPUS) - Benzinga",
          "url": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
          "publisher": "Benzinga",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data Establishes $750 Million Minimum Sale Threshold for Michigan AI Data Center; Management Believes Value Could Reach or Exceed $1.25 Billion - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/hyperscale-data-establishes-750-million-minimum-sale-threshold-for-michigan-ai-data-center-management-believes-value-could-reach-or-exceed-1-25-billion-302877068.html",
          "publisher": "PR Newswire",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "GPUS Looks 272.8% Overvalued on GF Value™ Amid Michigan AI Data Center Sale Plans - GuruFocus",
          "url": "https://www.gurufocus.com/news/9078983/gpus-looks-2728-overvalued-on-gf-value-amid-michigan-ai-data-center-sale-plans",
          "publisher": "GuruFocus",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data values its Michigan AI data cen... - Pluang",
          "url": "https://pluang.com/en/news-feed/hyperscale-data-tetapkan-batas-penjualan-minimum-750-juta-dolar-untuk-pusat-data",
          "publisher": "Pluang",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data sets $750 million minimum for Michigan data center - Investing.com",
          "url": "https://www.investing.com/news/company-news/hyperscale-data-sets-750-million-minimum-for-michigan-data-center-93CH-4899052",
          "publisher": "Investing.com",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data ends cryptomining operations at Michigan data center",
          "url": "https://www.datacenterdynamics.com/en/news/hyperscale-data-ends-cryptomining-operations-at-michigan-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-03",
          "source_tier": 3
        },
        {
          "title": "Hyperscale Data Provides Update on Progress of Michigan AI Data Center; More Than $70 Million Invested in Alliance Cloud Services and the Michigan Facility - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/hyperscale-data-provides-update-on-progress-of-michigan-ai-data-center-more-than-70-million-invested-in-alliance-cloud-services-and-the-michigan-facility-302881334.html",
          "publisher": "PR Newswire",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data Invests $70M In Michigan, Dilution Risks Remain - Hyperscale Data (AMEX:GPUS) - Benzinga",
          "url": "https://www.benzinga.com/markets/tech/26/09/61848012/hyperscale-data-invests-70m-in-michigan-heres-what-comes-next",
          "publisher": "Benzinga",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "See the Michigan data center video causing buzz on the internet - The Detroit News",
          "url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/23/dowagiac-michigan-data-center-noise-ring-camera-video/91892222007/",
          "publisher": "The Detroit News",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Kansans are clashing over hyperscale data centers. Where are they planned? - cjonline.com",
          "url": "https://www.cjonline.com/story/news/state/2026/08/10/where-are-data-centers-planned-in-kansas-proposed-ongoing-projects/91200168007/",
          "publisher": "cjonline.com",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data Has Ceased Bitcoin Mining Operations in Michigan as It Fulfills the Requirements of the AI Data Center Master Services Agreement Expected to be Worth Approximately $1.2 Billion - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/hyperscale-data-has-ceased-bitcoin-mining-operations-in-michigan-as-it-fulfills-the-requirements-of-the-ai-data-center-master-services-agreement-expected-to-be-worth-approximately-1-2-billion-302867149.html",
          "publisher": "PR Newswire",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data invests $70M in Michigan AI data center By Investing.com - Investing.com",
          "url": "https://www.investing.com/news/company-news/hyperscale-data-invests-70m-in-michigan-ai-data-center-93CH-4905149",
          "publisher": "Investing.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Southwest Michigan town gets reprieve from data center noise , for now - The Detroit News",
          "url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/21/dowagiac-data-center-michigan/91717134007/",
          "publisher": "The Detroit News",
          "date": "2026-09-21",
          "source_tier": 4
        },
        {
          "title": "Hyperscale Data ends cryptomining operations at Michigan data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/hyperscale-data-ends-cryptomining-operations-at-michigan-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-03",
          "source_tier": 3
        },
        {
          "title": "Hyperscale Data Converts Michigan Mining Farm into AI Data Center - ForkLog",
          "url": "https://forklog.com/en/hyperscale-data-converts-michigan-mining-farm-into-ai-data-center/",
          "publisher": "ForkLog",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Data center development: What does it bring to West Michigan? - WWMT",
          "url": "https://wwmt.com/news/local/data-center-development-west-michigan-power-energy-gaines-township-dowagiac-environment-water-consumers-energy",
          "publisher": "WWMT",
          "date": "2025-11-10",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Hyperscale Data Inc. data center in Dowagiac operated as bitcoin mining facility with fan based cooling until early September 2026, causing noise concerns.",
          "source_url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/23/dowagiac-michigan-data-center-noise-ring-camera-video/91892222007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Hyperscale Data facility will resume operations in November 2026 supporting artificial intelligence computing.",
          "source_url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/23/dowagiac-michigan-data-center-noise-ring-camera-video/91892222007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-21",
          "summary": "Company plans to resume operations in Dowagiac in November with new equipment for AI computing",
          "source_url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/21/dowagiac-data-center-michigan/91717134007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-21",
          "summary": "Hyperscale Data Inc. ceased bitcoin mining operation on September 2 to retool facility for artificial intelligence computing",
          "source_url": "https://www.detroitnews.com/story/news/local/michigan/2026/09/21/dowagiac-data-center-michigan/91717134007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Operations under Master Services Agreement expected to begin in November 2026",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-provides-update-on-progress-of-michigan-ai-data-center-more-than-70-million-invested-in-alliance-cloud-services-and-the-michigan-facility-302881334.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The company is working toward commencing operations under a previously announced master services agreement in November 2026",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-invests-70m-in-michigan-ai-data-center-93CH-4905149",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Hyperscale Data has invested more than $70 million into its Michigan AI data center facility as of September 15, 2026",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-invests-70m-in-michigan-ai-data-center-93CH-4905149",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The master services agreement provides for an initial 20 megawatts of critical AI compute capacity and has an initial 10 year term with two five year extension options",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-invests-70m-in-michigan-ai-data-center-93CH-4905149",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Michigan facility targeting November 2026 start for 20 MW contract with Alliance Cloud Services",
          "source_url": "https://www.benzinga.com/markets/tech/26/09/61848012/hyperscale-data-invests-70m-in-michigan-heres-what-comes-next",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Initial Master Services Agreement provides for 20 megawatts of critical AI compute capacity with 10 year initial term plus two 5 year extension options",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-provides-update-on-progress-of-michigan-ai-data-center-more-than-70-million-invested-in-alliance-cloud-services-and-the-michigan-facility-302881334.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Customer has right to increase critical AI compute capacity up to 52 MW",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-provides-update-on-progress-of-michigan-ai-data-center-more-than-70-million-invested-in-alliance-cloud-services-and-the-michigan-facility-302881334.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Hyperscale Data is evaluating options including outright sale, continued development or initial public offering of Sentinum subsidiary",
          "source_url": "https://www.gurufocus.com/news/9078983/gpus-looks-2728-overvalued-on-gf-value-amid-michigan-ai-data-center-sale-plans",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Alliance Cloud Services signed a master services agreement covering initial 20 megawatts of AI computing capacity with 10 year term and two five year extension options",
          "source_url": "https://www.gurufocus.com/news/9078983/gpus-looks-2728-overvalued-on-gf-value-amid-michigan-ai-data-center-sale-plans",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Management exploring options including selling campus, IPO of Sentinum subsidiary or continued development",
          "source_url": "https://pluang.com/en/news-feed/hyperscale-data-tetapkan-batas-penjualan-minimum-750-juta-dolar-untuk-pusat-data",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Alliance Cloud Services executed master services agreement with California based customer for initial 20 MW deployment at Michigan Campus",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-establishes-750-million-minimum-sale-threshold-for-michigan-ai-data-center-management-believes-value-could-reach-or-exceed-1-25-billion-302877068.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Alliance Cloud Services master services agreement with neocloud provider for deployment of 20 megawatts of AI compute capacity at Michigan campus.",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-sets-750-million-minimum-for-michigan-data-center-93CH-4899052",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Master services agreement initial 10 year term with two five year extension options.",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-sets-750-million-minimum-for-michigan-data-center-93CH-4899052",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Customer has rights to additional 32 MW of capacity at Michigan campus.",
          "source_url": "https://www.investing.com/news/company-news/hyperscale-data-sets-750-million-minimum-for-michigan-data-center-93CH-4899052",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "New 20 megawatt contract with California cloud provider",
          "source_url": "https://pluang.com/en/news-feed/hyperscale-data-tetapkan-batas-penjualan-minimum-750-juta-dolar-untuk-pusat-data",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Hyperscale Data explores sale or IPO of Michigan AI data center campus targeting valuation between 750 million and 1.25 billion dollars",
          "source_url": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "20 megawatt master services agreement with California cloud provider has 10 year term and two five year extension options",
          "source_url": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Campus could eventually support more than 300 megawatts",
          "source_url": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Company is evaluating options including sale, continued development or IPO of Sentinum subsidiary",
          "source_url": "https://www.benzinga.com/markets/tech/26/09/61769596/hyperscale-data-sees-billion-dollar-potential-in-michigan-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Michigan campus could eventually support more than 300 megawatts, depending on financing, regulatory approvals, utility agreements and customer demand",
          "source_url": "https://www.gurufocus.com/news/9078983/gpus-looks-2728-overvalued-on-gf-value-amid-michigan-ai-data-center-sale-plans",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Hyperscale Data ceased Bitcoin mining at its 617,000 square foot Dowagiac, Michigan facility on September 1, 2026, and is converting it for a California neocloud customer deploying 20MW in Q4 2026 with potential to scale to 52MW under a 10 year lease.",
          "source_url": "https://hyperscaledata.com/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Hyperscale Data is converting the Michigan site into an AI data center",
          "source_url": "https://forklog.com/en/hyperscale-data-converts-michigan-mining-farm-into-ai-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Unnamed California based neocloud customer signed lease agreement with Hyperscale Data in June 2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/hyperscale-data-ends-cryptomining-operations-at-michigan-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Hyperscale Data ceased all Bitcoin mining operations on September 1, 2026, at its Dowagiac, Michigan facility.",
          "source_url": "https://www.datacenterdynamics.com/en/news/hyperscale-data-ends-cryptomining-operations-at-michigan-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Hyperscale Data ceased bitcoin mining in Michigan",
          "source_url": "https://forklog.com/en/hyperscale-data-converts-michigan-mining-farm-into-ai-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "The master services agreement with a California neocloud provider is for deployment of 20 megawatts with an initial term of 10 years and two five year extension options",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-has-ceased-bitcoin-mining-operations-in-michigan-as-it-fulfills-the-requirements-of-the-ai-data-center-master-services-agreement-expected-to-be-worth-approximately-1-2-billion-302867149.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Hyperscale Data ceased all Bitcoin mining operations at its Michigan data center effective September 1, 2026",
          "source_url": "https://www.prnewswire.com/news-releases/hyperscale-data-has-ceased-bitcoin-mining-operations-in-michigan-as-it-fulfills-the-requirements-of-the-ai-data-center-master-services-agreement-expected-to-be-worth-approximately-1-2-billion-302867149.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "De Soto City Council approved Development Agreement with Mount Sunflower, LLC in August 2025",
          "source_url": "https://www.cjonline.com/story/news/state/2026/08/10/where-are-data-centers-planned-in-kansas-proposed-ongoing-projects/91200168007/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "lenox-township-data-center-macomb-mi",
      "name": "Lenox Township Data Center",
      "summary": "A proposed data center along the Interstate 94 industrial corridor in Lenox Township, Macomb County, Michigan prompted township board review in July 2026.",
      "state": "MI",
      "city": "Lenox Township",
      "county": "Macomb County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.59722,
      "longitude": -82.87806,
      "location_precision": "parcel",
      "location_source": "https://www.lenoxtwp.org/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Lenox Township Board industrial district ordinance record",
      "location_last_verified": "2026-09-16",
      "site_address": "26 Mile Road and Gratiot Avenue, Lenox Township, MI 48048",
      "site_address_source_url": "https://www.lenoxtwp.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.lenoxtwp.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lenox-township-data-center-macomb-mi",
      "source": "https://www.facebook.com/groups/844579212655837/posts/2576651669448574/",
      "basis": "official_record",
      "sources": [
        {
          "title": "‼️🚨UPDATE ON DATA CENTER: NEW INFORMATION REGARDING THE POSSIBLE NEW LENOX DATA CENTER LOCATION I previously posted about a rumored location near Gougar Road and Haven Avenue. I want to correct and update that information",
          "url": "https://www.facebook.com/groups/844579212655837/posts/2576651669448574/",
          "publisher": "www.facebook.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Lenox Township Board Meeting discussing the I-94 Industrial District Ordinance and Data Centers - July 13, 2026 Watch \"The Parade of Horrors\" speeches during public comment!",
          "url": "https://www.facebook.com/groups/stclaircountymi/posts/27492786990330276/",
          "publisher": "www.facebook.com",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Data center concerns have Lenox Township residents demanding transparency - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/news/investigations/2026/09/03/data-center-concerns-have-lenox-township-residents-demanding-transparency/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "A rumored data center location was previously reported near Gougar Road and Haven Avenue",
          "source_url": "https://www.facebook.com/groups/844579212655837/posts/2576651669448574/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed data center in Lenox Township has drawn concerns from residents demanding transparency about the project.",
          "source_url": "https://www.lenoxtwp.org/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "liberty-center-one-liberty-center-one-royal-oak-mi",
      "name": "Liberty Center One Royal Oak Data Center",
      "summary": "Liberty Center One operates a commercial colocation data center at 4815 Delemere Avenue in Royal Oak, Oakland County, Michigan.",
      "state": "MI",
      "city": "Royal Oak",
      "county": "Oakland County",
      "status": "operational",
      "developer": "Liberty Center One",
      "capacity_mw": 4,
      "latitude": 42.533508,
      "longitude": -83.177393,
      "location_precision": "address",
      "location_source": "https://www.libertycenterone.com/",
      "location_verified_at": null,
      "coordinate_source": "Liberty Center One Royal Oak specification",
      "location_last_verified": null,
      "site_address": "4815 Delemere Avenue, Royal Oak, MI 48073",
      "site_address_source_url": "https://www.libertycenterone.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.libertycenterone.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/liberty-center-one-liberty-center-one-royal-oak-mi",
      "source": "https://www.libertycenterone.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Liberty Center One Royal Oak Data Center Official Disclosure",
          "url": "https://www.libertycenterone.com/",
          "publisher": "Liberty Center One",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.libertycenterone.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "managedway-company-managedway-byk1-byron-center-mi",
      "name": "ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4)",
      "summary": "ManagedWay and 123NET operate the BYK1 and DC4 commercial colocation data center at 400 76th Street SW in Byron Center, Kent County, Michigan.",
      "state": "MI",
      "city": "Byron Center",
      "county": "Kent County",
      "status": "operational",
      "developer": "ManagedWay / 123NET",
      "capacity_mw": 6,
      "latitude": 42.825353,
      "longitude": -85.672818,
      "location_precision": "address",
      "location_source": "https://www.managedway.com/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "ManagedWay BYK1 and 123NET DC4 specification",
      "location_last_verified": null,
      "site_address": "400 76th Street SW, Byron Center, MI 49315",
      "site_address_source_url": "https://www.managedway.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.managedway.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/managedway-company-managedway-byk1-byron-center-mi",
      "source": "https://www.managedway.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "ManagedWay and 123NET Byron Center Data Center (BYK1 / DC4) Official Disclosure",
          "url": "https://www.managedway.com/data-centers/",
          "publisher": "ManagedWay / 123NET",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.managedway.com/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "managedway-company-managedway-sfj2-southfield-mi",
      "name": "ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2)",
      "summary": "ManagedWay and 123NET operate the SFJ2, DC2, and DC3 commercial colocation campus at 24275 and 24245 Northwestern Highway in Southfield, Oakland County, Michigan.",
      "state": "MI",
      "city": "Southfield",
      "county": "Oakland County",
      "status": "operational",
      "developer": "ManagedWay / 123NET",
      "capacity_mw": 8,
      "latitude": 42.467029,
      "longitude": -83.234962,
      "location_precision": "address",
      "location_source": "https://www.managedway.com/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "ManagedWay SFJ2 and 123NET DC2/DC3 specification",
      "location_last_verified": null,
      "site_address": "24275 Northwestern Highway, Southfield, MI 48075",
      "site_address_source_url": "https://www.managedway.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.managedway.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/managedway-company-managedway-sfj2-southfield-mi",
      "source": "https://www.managedway.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2) Official Disclosure",
          "url": "https://www.managedway.com/data-centers/",
          "publisher": "ManagedWay / 123NET",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.managedway.com/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "managedway-company-managedway-tym1-troy-mi",
      "name": "ManagedWay Troy Data Center (TYM1)",
      "summary": "ManagedWay operates the TYM1 commercial colocation data center at 319 Executive Drive in Troy, Oakland County, Michigan.",
      "state": "MI",
      "city": "Troy",
      "county": "Oakland County",
      "status": "operational",
      "developer": "ManagedWay",
      "capacity_mw": 5,
      "latitude": 42.537158,
      "longitude": -83.099861,
      "location_precision": "address",
      "location_source": "https://www.managedway.com/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "ManagedWay Troy TYM1 specification",
      "location_last_verified": null,
      "site_address": "319 Executive Drive, Troy, MI 48083",
      "site_address_source_url": "https://www.managedway.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.managedway.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/managedway-company-managedway-tym1-troy-mi",
      "source": "https://www.managedway.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "ManagedWay Troy Data Center (TYM1) Official Disclosure",
          "url": "https://www.managedway.com/data-centers/",
          "publisher": "ManagedWay",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.managedway.com/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "mason-data-center-proposal-mi",
      "name": "Mason Data Center Proposal",
      "summary": "A proposed data center campus on farmland adjacent to Mason in Ingham County, Michigan prompted an annexation petition and municipal town hall in August 2026.",
      "state": "MI",
      "city": "Mason",
      "county": "Ingham County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.57917,
      "longitude": -84.44361,
      "location_precision": "parcel",
      "location_source": "https://www.mason.mi.us/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Mason and Michigan State Boundary Commission annexation filing",
      "location_last_verified": "2026-09-16",
      "site_address": "Eden Road and Kipp Road, Mason, MI 48854",
      "site_address_source_url": "https://www.mason.mi.us/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.mason.mi.us/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/mason-data-center-proposal-mi",
      "source": "https://www.lansingstatejournal.com/story/news/local/2026/08/18/mason-data-center-town-hall-annexation-state-boundary-commission/91345235007/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Mason sets town hall for data center proposal as new details emerge - Lansing State Journal",
          "url": "https://www.lansingstatejournal.com/story/news/local/2026/08/18/mason-data-center-town-hall-annexation-state-boundary-commission/91345235007/",
          "publisher": "Lansing State Journal",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Mason sets town hall for data center proposal as new details emerge - Lansing State Journal",
          "url": "https://www.lansingstatejournal.com/story/news/local/2026/08/18/mason-data-center-town-hall-annexation-state-boundary-commission/91345235007/",
          "publisher": "Lansing State Journal",
          "date": "2026-08-18",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-18",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A data center proposal in Mason prompted the city to schedule a town hall as new details about the project emerged.",
          "source_url": "https://www.mason.mi.us/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "meta-howell-data-center-mi",
      "name": "Meta Howell Township Data Center",
      "summary": "Meta proposed a hyperscale data center campus in Howell Township, Livingston County, Michigan.",
      "state": "MI",
      "city": "Howell",
      "county": "Livingston County",
      "status": "proposed",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 42.60813,
      "longitude": -83.93434,
      "location_precision": "parcel",
      "location_source": "https://howelltownshipmi.org/",
      "location_verified_at": null,
      "coordinate_source": "Howell Township planning record",
      "location_last_verified": null,
      "site_address": "Grand River Avenue and Fleming Road, Howell, MI 48855",
      "site_address_source_url": "https://howelltownshipmi.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://howelltownshipmi.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-howell-data-center-mi",
      "source": "https://planetdetroit.org/2025/11/meta-data-center-howell-township/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta is behind planned Howell data center: Township trustee - Planet Detroit",
          "url": "https://planetdetroit.org/2025/11/meta-data-center-howell-township/",
          "publisher": "Planet Detroit",
          "date": "2025-11-21",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-11-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta is identified by a Howell Township trustee as the developer behind a planned data center in Howell, Michigan.",
          "source_url": "https://planetdetroit.org/2025/11/meta-data-center-howell-township/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "microsoft-dorr-township-data-center-mi",
      "name": "Microsoft Dorr Township Data Center",
      "summary": "Microsoft proposed a hyperscale data center campus in Dorr Township, Allegan County, Michigan.",
      "state": "MI",
      "city": "Dorr Township",
      "county": "Allegan County",
      "status": "proposed",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 42.72462,
      "longitude": -85.72265,
      "location_precision": "parcel",
      "location_source": "https://dorrtownship.org/",
      "location_verified_at": null,
      "coordinate_source": "Dorr Township planning record",
      "location_last_verified": null,
      "site_address": "142nd Avenue and US 131, Dorr Township, MI 49323",
      "site_address_source_url": "https://dorrtownship.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://dorrtownship.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-dorr-township-data-center-mi",
      "source": "https://wwmt.com/news/local/save-pure-michigan-dorr-township-residents-hold-meeting-to-stop-data-center-microsoft-allegan-county-ai-artificial-intelligence-western-michigan",
      "basis": "official_record",
      "sources": [
        {
          "title": "Pushback against Microsoft's proposed data center in Dorr Township continues - WWMT",
          "url": "https://wwmt.com/news/local/save-pure-michigan-dorr-township-residents-hold-meeting-to-stop-data-center-microsoft-allegan-county-ai-artificial-intelligence-western-michigan",
          "publisher": "WWMT",
          "date": "2026-02-01",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-02-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed Microsoft data center in Dorr Township faces continued local pushback as of February 2026.",
          "source_url": "https://wwmt.com/news/local/save-pure-michigan-dorr-township-residents-hold-meeting-to-stop-data-center-microsoft-allegan-county-ai-artificial-intelligence-western-michigan",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "microsoft-gaines-township-data-center-mi",
      "name": "Microsoft Gaines Township Data Center",
      "summary": "Microsoft acquired 316 acres in Gaines Township, Kent County, Michigan for a proposed data center campus and requested a deferral of its township planning review in February 2026.",
      "state": "MI",
      "city": "Gaines Township",
      "county": "Kent County",
      "status": "proposed",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 42.8412,
      "longitude": -85.5528,
      "location_precision": "parcel",
      "location_source": "https://gainestownship.org/",
      "location_verified_at": null,
      "coordinate_source": "Gaines Township planning commission record",
      "location_last_verified": null,
      "site_address": "68th Street SE and Patterson Avenue, Gaines Township, MI 49512",
      "site_address_source_url": "https://gainestownship.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://gainestownship.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-gaines-township-data-center-mi",
      "source": "https://www.mlive.com/news/grand-rapids/2026/02/microsoft-requests-delay-for-gaines-township-data-center-meeting.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Microsoft requests delay for Gaines Township data center meeting - MLive.com",
          "url": "https://www.mlive.com/news/grand-rapids/2026/02/microsoft-requests-delay-for-gaines-township-data-center-meeting.html",
          "publisher": "MLive.com",
          "date": "2026-02-06",
          "source_tier": 1
        },
        {
          "title": "Kent County residents halt Microsoft data center plan - mlive.com",
          "url": "https://www.mlive.com/news/grand-rapids/2025/12/kent-county-residents-halt-microsoft-data-center-plan.html",
          "publisher": "mlive.com",
          "date": "2025-12-18",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-02-06",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft requested a delay for a Gaines Township data center meeting, and Kent County residents halted the plan.",
          "source_url": "https://www.mlive.com/news/grand-rapids/2026/02/microsoft-requests-delay-for-gaines-township-data-center-meeting.html",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "oracle-and-openai-saline-township-data-center-washtenaw-mi",
      "name": "Oracle and OpenAI Saline Township Data Center",
      "summary": "Related Digital, Oracle, and OpenAI are constructing a 1,400 megawatt hyperscale AI data center campus on 250 acres in Saline Township, Washtenaw County, Michigan.",
      "state": "MI",
      "city": "Saline Township",
      "county": "Washtenaw County",
      "status": "under_construction",
      "developer": "Related Digital / Oracle / OpenAI",
      "capacity_mw": 1400,
      "latitude": 42.28139,
      "longitude": -83.74833,
      "location_precision": "parcel",
      "location_source": "https://salinetownship.org/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Saline Township site approval and Washtenaw County parcel record",
      "location_last_verified": "2026-09-16",
      "site_address": "Michigan Avenue and Austin Road, Saline Township, MI 48176",
      "site_address_source_url": "https://salinetownship.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://salinetownship.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/oracle-and-openai-saline-township-data-center-washtenaw-mi",
      "source": "https://www.mlive.com/news/ann-arbor/2026/08/openai-data-center-project-south-of-ann-arbor-hits-1-million-work-hours.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "OpenAI data center project south of Ann Arbor hits 1 million work hours - MLive.com",
          "url": "https://www.mlive.com/news/ann-arbor/2026/08/openai-data-center-project-south-of-ann-arbor-hits-1-million-work-hours.html",
          "publisher": "MLive.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Residents and officials feeling powerless in Michigan data center fights - bridgemi.com",
          "url": "https://bridgemi.com/michigan-environment-watch/residents-and-officials-feeling-powerless-in-michigan-data-center-fights/",
          "publisher": "bridgemi.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Oracle and OpenAI's Saline Township data center going up quickly - The Detroit News",
          "url": "https://www.detroitnews.com/picture-gallery/news/michigan/2026/08/31/construction-update-saline-twp-data-center-project-aka-the-barn/91490973007/",
          "publisher": "The Detroit News",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "This golf course’s new owners are building $16 billion data center next door - GOLF.com",
          "url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "publisher": "GOLF.com",
          "date": "2026-08-23",
          "source_tier": 4
        },
        {
          "title": "Developer of controversial Saline Township data center buys neighboring golf course - CBS News",
          "url": "https://www.cbsnews.com/detroit/news/related-digital-buys-rustic-glen-golf-club/",
          "publisher": "CBS News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "‘We don’t even know who signed the contracts’: AG Nessel challenges Michigan’s secret data center deal - thelivingstonpost.com",
          "url": "https://thelivingstonpost.com/we-dont-even-know-who-signed-the-contracts-ag-nessel-challenges-michigans-secret-data-center-deal/",
          "publisher": "thelivingstonpost.com",
          "date": "2026-08-15",
          "source_tier": 4
        },
        {
          "title": "Record $16B Data Center Project Advances in Michigan - enr.com",
          "url": "https://www.enr.com/articles/63087-record-16b-data-center-project-advances-in-michigan",
          "publisher": "enr.com",
          "date": "2026-06-02",
          "source_tier": 4
        },
        {
          "title": "Oracle and OpenAI's Saline Township data center going up quickly - The Detroit News",
          "url": "https://www.detroitnews.com/picture-gallery/news/michigan/2026/08/31/construction-update-saline-twp-data-center-project-aka-the-barn/91490973007/",
          "publisher": "The Detroit News",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "This golf course’s new owners are building $16 billion data center next door - GOLF.com",
          "url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "publisher": "GOLF.com",
          "date": "2026-08-23",
          "source_tier": 4
        },
        {
          "title": "Oracle’s $43B data center gets a tax break — but local officials put a big cap on it - Crain's Detroit",
          "url": "https://www.crainsdetroit.com/technology/cdb-saline-data-center-tax-oracle-20260715/",
          "publisher": "Crain's Detroit",
          "date": "2026-07-15",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "Project known as The Barn located in Saline Township on Braun Road",
          "source_url": "https://www.detroitnews.com/picture-gallery/news/michigan/2026/08/31/construction-update-saline-twp-data-center-project-aka-the-barn/91490973007/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Oracle and OpenAI's data center project in Saline Township has reached 1 million work hours and is reported to be going up quickly, with the developer also purchasing a neighboring golf course.",
          "source_url": "https://salinetownship.org/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "Oracle and OpenAI's Saline Township data center advancing at rapid pace as of August 26, 2026",
          "source_url": "https://www.detroitnews.com/picture-gallery/news/michigan/2026/08/31/construction-update-saline-twp-data-center-project-aka-the-barn/91490973007/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "Related Digital agreed to donate $14 million to Mason Township and local fire departments",
          "source_url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "Oracle received a 50 percent tax reduction for the project",
          "source_url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "The Barn is under construction with completion slated for 2027",
          "source_url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "The Barn data center is a $16 billion project being built on behalf of OpenAI and Oracle",
          "source_url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "Related Digital purchased Rustic Glen Golf Club in Saline Township, Michigan, adjacent to The Barn data center project",
          "source_url": "https://golf.com/news/data-center-rustic-glen-golf-club-michigan/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The Barn is set to be completed in 2027.",
          "source_url": "https://bridgemi.com/michigan-environment-watch/residents-and-officials-feeling-powerless-in-michigan-data-center-fights/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The Barn, OpenAI and Oracle's $7 billion hyperscale data center, will be built in Saline Township.",
          "source_url": "https://bridgemi.com/michigan-environment-watch/residents-and-officials-feeling-powerless-in-michigan-data-center-fights/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Saline Township initially voted against rezoning farmland for The Barn; developers sued and township settled.",
          "source_url": "https://bridgemi.com/michigan-environment-watch/residents-and-officials-feeling-powerless-in-michigan-data-center-fights/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Related Digital purchased Rustic Glen Golf Club, an 18 hole public course in Saline Township",
          "source_url": "https://www.cbsnews.com/detroit/news/related-digital-buys-rustic-glen-golf-club/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Related Digital is building a $16 billion data center known as The Barn for Oracle and OpenAI in Saline Township",
          "source_url": "https://www.cbsnews.com/detroit/news/related-digital-buys-rustic-glen-golf-club/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-15",
          "summary": "University of Michigan confirmed plans to build a $1.2 billion high performance computing center with Los Alamos National Laboratory on 144 acres in Ypsilanti Township",
          "source_url": "https://thelivingstonpost.com/we-dont-even-know-who-signed-the-contracts-ag-nessel-challenges-michigans-secret-data-center-deal/",
          "source_tier": 1
        },
        {
          "status": "approved",
          "effective_at": "2026-07-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Oracle's $43 billion data center received a tax break from local officials, who placed a cap on the incentive.",
          "source_url": "https://www.crainsdetroit.com/technology/cdb-saline-data-center-tax-oracle-20260715/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "otava-llc-otava-metro-detroit-westland-mi",
      "name": "Otava Metro Detroit Data Center (Westland)",
      "summary": "Otava operates its Metro Detroit cloud and colocation data center at 6435 North Hix Road in Westland, Wayne County, Michigan.",
      "state": "MI",
      "city": "Westland",
      "county": "Wayne County",
      "status": "operational",
      "developer": "Otava",
      "capacity_mw": 6,
      "latitude": 42.331172,
      "longitude": -83.419408,
      "location_precision": "address",
      "location_source": "https://www.otava.com/locations/detroit-data-center/",
      "location_verified_at": null,
      "coordinate_source": "Otava Metro Detroit specification",
      "location_last_verified": null,
      "site_address": "6435 North Hix Road, Westland, MI 48185",
      "site_address_source_url": "https://www.otava.com/locations/detroit-data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.otava.com/locations/detroit-data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/otava-llc-otava-metro-detroit-westland-mi",
      "source": "https://www.otava.com/locations/detroit-data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Otava Metro Detroit Data Center (Westland) Official Disclosure",
          "url": "https://www.otava.com/locations/detroit-data-center/",
          "publisher": "Otava",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://www.otava.com/locations/detroit-data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "raeden-gibraltar-data-center-mi",
      "name": "Raeden Gibraltar Data Center",
      "summary": "Raeden proposed a 100 megawatt data center development in Gibraltar, Wayne County, Michigan, which was paused by a municipal moratorium and became the subject of litigation in August 2026.",
      "state": "MI",
      "city": "Gibraltar",
      "county": "Wayne County",
      "status": "proposed",
      "developer": "Raeden",
      "capacity_mw": 100,
      "latitude": 42.095,
      "longitude": -83.1895,
      "location_precision": "address",
      "location_source": "https://www.cityofgibraltarmi.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Gibraltar McLouth Steel site record",
      "location_last_verified": "2026-09-16",
      "site_address": "28000 West Jefferson Avenue, Gibraltar, MI 48173",
      "site_address_source_url": "https://www.cityofgibraltarmi.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.cityofgibraltarmi.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi",
      "source": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-24",
          "source_tier": 3
        },
        {
          "title": "Raeden Gibraltar Data Center: 100 MW data center in Michigan",
          "url": "https://morethanjustparks.com/data-center-tracker/raeden-gibraltar-data-center-mi--0bcf958a-7788-4863-baae-45bc30b6299b",
          "publisher": "morethanjustparks.com",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Developers challenge Gibraltar's data center moratorium in court - Detroit Free Press",
          "url": "https://www.freep.com/story/news/politics/2026/08/20/data-center-moratorium-gibraltar-raeden-lawsuit/91367873007/",
          "publisher": "Detroit Free Press",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Data center developer sues Michigan city, challenging one-year pause on projects - MLive.com",
          "url": "https://www.mlive.com/news/detroit/2026/08/data-center-developer-sues-michigan-city-challenging-one-year-pause-on-projects.html",
          "publisher": "MLive.com",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-24",
          "source_tier": 3
        },
        {
          "title": "Data center developer accuses Gibraltar city officials of unlawfully imposing 1 year moratorium - cbsnews.com",
          "url": "https://www.cbsnews.com/detroit/news/raedan-acquisition-sues-gibraltar-data-center-moratorium/",
          "publisher": "cbsnews.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Data Center Developer Sues Michigan City Over Moratorium - GovTech",
          "url": "https://www.govtech.com/public-safety/data-center-developer-sues-michigan-city-over-moratorium",
          "publisher": "GovTech",
          "date": "2026-08-20",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "stalled",
          "effective_at": "2026-08-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court.",
          "source_url": "https://www.cityofgibraltarmi.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Raeden planned to install 35 backup diesel generators",
          "source_url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Raeden submitted application to Gibraltar in mid February 2026",
          "source_url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Raeden proposed 100MW data center at 27800 W. Jefferson, former McLouth Steel site",
          "source_url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The city council issued a letter in July 2026 stating it would not process the February application until the moratorium ended",
          "source_url": "https://www.cbsnews.com/detroit/news/raedan-acquisition-sues-gibraltar-data-center-moratorium/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Raeden Acquisitions submitted an application to the city on February 17, 2026 for a data center at the former McLouth steel mill site",
          "source_url": "https://www.cbsnews.com/detroit/news/raedan-acquisition-sues-gibraltar-data-center-moratorium/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Raeden proposed to repurpose McLouth Steel industrial site into 100 megawatt inference data center",
          "source_url": "https://www.freep.com/story/news/politics/2026/08/20/data-center-moratorium-gibraltar-raeden-lawsuit/91367873007/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Raeden Acquisitions and CAL Realty filed a lawsuit in U.S. District Court for the Eastern District of Michigan on August 17, challenging the moratorium as unlawful and seeking approval of a plan to transform a former steel mill into a data center.",
          "source_url": "https://www.govtech.com/public-safety/data-center-developer-sues-michigan-city-over-moratorium",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "raeden-raeden-michigan-1-detroit-mi",
      "name": "Raeden Michigan 1 Data Center (Detroit)",
      "summary": "Raeden operates the Michigan 1 carrier hotel and colocation data center at 615 West Lafayette Boulevard in downtown Detroit, Wayne County, Michigan.",
      "state": "MI",
      "city": "Detroit",
      "county": "Wayne County",
      "status": "operational",
      "developer": "Raeden",
      "capacity_mw": 10,
      "latitude": 42.32854,
      "longitude": -83.053799,
      "location_precision": "address",
      "location_source": "https://raeden.com/",
      "location_verified_at": null,
      "coordinate_source": "Raeden Michigan 1 Fort Street Carrier Hotel specification",
      "location_last_verified": null,
      "site_address": "615 West Lafayette Boulevard, Detroit, MI 48226",
      "site_address_source_url": "https://raeden.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://raeden.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/raeden-raeden-michigan-1-detroit-mi",
      "source": "https://raeden.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Raeden Michigan 1 Data Center (Detroit) Official Disclosure",
          "url": "https://raeden.com/",
          "publisher": "Raeden",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.",
          "source_url": "https://raeden.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "rural-michigan-farm-data-center-ionia-mi",
      "name": "Rural Michigan Farm Data Center",
      "summary": "A rural property near Ionia in Ionia County, Michigan sought municipal annexation for data center development, prompting public planning sessions in 2026.",
      "state": "MI",
      "city": "Ionia",
      "county": "Ionia County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.98194,
      "longitude": -85.06667,
      "location_precision": "parcel",
      "location_source": "https://cityofionia.org/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Ionia municipal planning session record",
      "location_last_verified": "2026-09-16",
      "site_address": "State Road M 66 Corridor, Ionia, MI 48846",
      "site_address_source_url": "https://cityofionia.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://cityofionia.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/rural-michigan-farm-data-center-ionia-mi",
      "source": "https://www.fox17online.com/news/local-news/greenville-ionia-belding-lowell/ionia-has-no-data-center-proposal-but-leaders-are-starting-the-conversation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Ionia has no data center proposal, but leaders are starting the conversation - fox17online.com",
          "url": "https://www.fox17online.com/news/local-news/greenville-ionia-belding-lowell/ionia-has-no-data-center-proposal-but-leaders-are-starting-the-conversation",
          "publisher": "fox17online.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "A farm wants a data center in rural Michigan — and it has to join a city to do it - Crain's Detroit",
          "url": "https://www.crainsdetroit.com/technology/cdb-vevay-township-mason-data-center-20260903/",
          "publisher": "Crain's Detroit",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Ionia to host ‘proactive’ meeting on data centers - woodtv.com",
          "url": "https://www.woodtv.com/news/ionia-county/ionia-to-host-proactive-meeting-on-data-centers/",
          "publisher": "woodtv.com",
          "date": "2026-09-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A farm in rural Michigan near Ionia is seeking to annex into a city in order to host a data center, and Ionia is planning a proactive public meeting on data centers.",
          "source_url": "https://cityofionia.org/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A farm in rural Michigan is seeking to host a data center and must annex into a city to do so, with Ionia scheduling a proactive public meeting on the matter.",
          "source_url": "https://cityofionia.org/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "switch-grand-rapids-campus-mi",
      "name": "Switch Grand Rapids campus",
      "summary": "Switch operates The Pyramid Campus at 4500 60th Street SE in Grand Rapids, Kent County, Michigan.",
      "state": "MI",
      "city": "Grand Rapids",
      "county": "Kent County",
      "status": "operational",
      "developer": "Switch",
      "capacity_mw": 100,
      "latitude": 42.9619253,
      "longitude": -85.6561793,
      "location_precision": "address",
      "location_source": "https://www.switch.com/grand-rapids/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Switch Grand Rapids Pyramid Campus specification",
      "location_last_verified": "2026-09-14",
      "site_address": "4500 60th Street SE, Grand Rapids, MI 49512",
      "site_address_source_url": "https://www.switch.com/grand-rapids/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.switch.com/grand-rapids/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/switch-grand-rapids-campus-mi",
      "source": "https://www.switch.com/locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Switch: Locations",
          "url": "https://www.switch.com/locations/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Switch: Switch Grand Rapids campus",
          "url": "https://www.switch.com/grand-rapids/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Switch lists Switch Grand Rapids campus at Grand Rapids, Michigan on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.switch.com/grand-rapids/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "university-of-michigan-los-alamos-national-laboratory-hyperscale-data-center-mi",
      "name": "University of Michigan and Los Alamos National Laboratory Hyperscale Data Center",
      "summary": "The University of Michigan and Los Alamos National Laboratory proposed a 220,000 square foot computing and data center facility along Textile Road in Ypsilanti Township, Washtenaw County, Michigan.",
      "state": "MI",
      "city": "Ypsilanti Township",
      "county": "Washtenaw County",
      "status": "proposed",
      "developer": "University of Michigan / Los Alamos National Laboratory",
      "capacity_mw": null,
      "latitude": 42.2136782,
      "longitude": -83.5991838,
      "location_precision": "parcel",
      "location_source": "https://ytown.org/",
      "location_verified_at": "2026-10-07",
      "coordinate_source": "Ypsilanti Township Textile Road site record",
      "location_last_verified": "2026-10-07",
      "site_address": "Textile Road and Hitchingham Road, Ypsilanti Township, MI 48197",
      "site_address_source_url": "https://ytown.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://ytown.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/university-of-michigan-los-alamos-national-laboratory-hyperscale-data-center-mi",
      "source": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Resistance Grows Against MI Data Center That Would Fuel Nuclear Weapons Research - Truthout",
          "url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "publisher": "Truthout",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "University of Michigan's Ypsilanti Township computing center plans meet with anger at town hall: 'Enormous distrust' - Planet Detroit",
          "url": "https://planetdetroit.org/2026/09/ypsilanti-township-uofm-data-center-opposition/",
          "publisher": "Planet Detroit",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "U M to hold town hall Wednesday over planned data center - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township residents oppose University of Michigan data center plan - cbsnews.com",
          "url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "publisher": "cbsnews.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Elected Officials Are Facing a Reckoning Over Their Collusion with Big AI - In These Times",
          "url": "https://inthesetimes.com/article/big-tech-artificial-intelligence-ai-data-center-protests",
          "publisher": "In These Times",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township officials vow to fight to stop U M/Los Alamos center to the end",
          "url": "https://www.wemu.org/wemu-news/2026-07-16/ypsilanti-township-officials-vow-to-fight-to-stop-u-m-los-alamos-center-to-the-end",
          "publisher": "www.wemu.org",
          "date": "2026-07-16",
          "source_tier": 4
        },
        {
          "title": "‘We don’t matter to them’: Ypsilanti Township pushed back on University of Michigan, Los Alamos data center - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Michigan Data Centers: The Weekly Download - Michigan Advance",
          "url": "https://michiganadvance.com/2026/08/17/michigan-data-centers-the-weekly-download-3-2-2-2-2-2-2-2-2/",
          "publisher": "Michigan Advance",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township fight over U M computing center intensifies with moratorium - WDET 101.9 FM",
          "url": "https://wdet.org/2026/09/11/ypsilanti-township-fight-over-u-m-computing-center-intensifies-with-moratorium/",
          "publisher": "WDET 101.9 FM",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "‘We don’t matter to them’: Ypsilanti Township pushed back on University of Michigan, Los Alamos data center - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township eyes moratorium on power transmission to slow U-M data center - Bridge Michigan",
          "url": "https://bridgemi.com/business-watch/ypsilanti-township-eyes-moratorium-on-power-transmission-to-slow-u-m-data-center/",
          "publisher": "Bridge Michigan",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Michigan township combats nuclear weapons data center by passing ban on new electrical infrastructure — 220,000-square-foot hyperscale project is backed by University of Michigan and the Los Alamos National Laboratory - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/michigan-township-combats-nuclear-weapons-data-center-by-passing-ban-on-new-electrical-infrastructure-220-000-square-foot-hyperscale-project-is-backed-by-university-of-michigan-and-the-los-alamos-national-laboratory",
          "publisher": "Tom's Hardware",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "'We will fight to our very last breath': Michigan township uses 6 month power moratorium to stall U M, Los Alamos data center - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/michigan-ypsilanti-township-power-moratorium-data-center/",
          "publisher": "The Cool Down",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Township pushes back against data center proposal - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/video/news/2026/08/13/township-pushes-back-against-data-center-proposal/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "U M selects site for joint data center with Los Alamos Laboratory - Detroit Free Press - Breaking news, sports, business, entertainment",
          "url": "https://www.freep.com/story/news/environment/2026/08/12/university-michigan-los-alamos-national-laboratory-data-center-ypsilanti/91276431007/",
          "publisher": "Detroit Free Press - Breaking news, sports, business, entertainment",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Weekly Data Center Watch: Ypsilanti Township Residents Challenge U M - The Sun Times News",
          "url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "publisher": "The Sun Times News",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Michigan township combats nuclear weapons data center by passing ban on new electrical infrastructure — 220,000-square-foot hyperscale project is backed by University of Michigan and the Los Alamos National Laboratory - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/michigan-township-combats-nuclear-weapons-data-center-by-passing-ban-on-new-electrical-infrastructure-220-000-square-foot-hyperscale-project-is-backed-by-university-of-michigan-and-the-los-alamos-national-laboratory",
          "publisher": "Tom's Hardware",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "‘We don’t matter to them’: Ypsilanti Township pushed back on University of Michigan, Los Alamos data center - clickondetroit.com",
          "url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "publisher": "clickondetroit.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Dingell Opposes Textile Road Site for Los Alamos Computing Center",
          "url": "https://thesuntimesnews.com/dingell-opposes-textile-road-site-for-los-alamos-computing-center/",
          "publisher": "thesuntimesnews.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "‘We don’t deserve this’: UMich town hall over data center draws severe backlash from community members - michigandaily.com",
          "url": "https://www.michigandaily.com/news/administration/we-dont-deserve-this-umich-town-hall-over-data-center-draws-severe-backlash-from-community-members/",
          "publisher": "michigandaily.com",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "'We will fight to our very last breath': Michigan township uses 6-month power moratorium to stall U-M, Los Alamos data center - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/michigan-ypsilanti-township-power-moratorium-data-center/",
          "publisher": "The Cool Down",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Data center protesters to gather Saturday at Ypsilanti, Van Buren Township line - MLive.com",
          "url": "https://www.mlive.com/news/ann-arbor/2026/09/data-center-protesters-to-gather-saturday-at-ypsilanti-van-buren-township-line.html",
          "publisher": "MLive.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "U-M’s proposed computing center draws concerns over role in nuclear weapons modernization - Michigan Advance",
          "url": "https://michiganadvance.com/2026/09/04/u-ms-proposed-computing-center-draws-concerns-over-role-in-nuclear-weapons-modernization/",
          "publisher": "Michigan Advance",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "UMich’s data center has a similar playbook as OpenAI’s - The Michigan Daily",
          "url": "https://www.michigandaily.com/opinion/columns/umichs-playbook-in-ypsilanti-township-isnt-that-different-than-openais-in-saline/",
          "publisher": "The Michigan Daily",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Dingell opposes U-M Los Alamos data center project, urges greater community transparency - The Michigan Daily",
          "url": "https://www.michigandaily.com/news/government/dingell-opposes-u-m-los-alamos-data-center-project-and-urges-greater-community-transparency/",
          "publisher": "The Michigan Daily",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Michigan township combats nuclear weapons data center by passing ban on new electrical infrastructure — 220,000-square-foot hyperscale project is backed by University of Michigan and the Los Alamos National Laboratory - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/michigan-township-combats-nuclear-weapons-data-center-by-passing-ban-on-new-electrical-infrastructure-220-000-square-foot-hyperscale-project-is-backed-by-university-of-michigan-and-the-los-alamos-national-laboratory",
          "publisher": "Tom's Hardware",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "U M affirms Ypsilanti $1.2B computing center site; township officials vow fight - Bridge Michigan",
          "url": "https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/",
          "publisher": "Bridge Michigan",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Residents and officials push back on $1.25B University of Michigan data center plan - WXYZ Channel 7",
          "url": "https://www.wxyz.com/videos/news/data-centers/residents-and-officials-push-back-on-1-25b-university-of-michigan-data-center-plan",
          "publisher": "WXYZ Channel 7",
          "date": "2026-07-15",
          "source_tier": 4
        },
        {
          "title": "U M to hold town hall Wednesday over planned data center - clickondetroit.com",
          "url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "publisher": "clickondetroit.com",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "UM town hall panel faces angry, jeering crowd over plan for joint computing center with Los Alamos - Michigan Public",
          "url": "https://www.michiganpublic.org/education/2026-09-10/um-town-hall-panel-faces-angry-jeering-crowd-over-plan-for-joint-computing-center-with-los-alamos",
          "publisher": "Michigan Public",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township residents protest U M, Los Alamos data center at second town hall - The Eastern Echo",
          "url": "https://www.easternecho.com/article/2026/10/ypsilanti-township-residents-protest-u-m-los-alamos-data-center-at-second-town-hall",
          "publisher": "The Eastern Echo",
          "date": "2026-10-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "University of Michigan and Los Alamos National Laboratory held a second town hall on October 1, 2026, about the proposed data center",
          "source_url": "https://www.easternecho.com/article/2026/10/ypsilanti-township-residents-protest-u-m-los-alamos-data-center-at-second-town-hall",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "University of Michigan confirmed it will build its data center in Hydro Park near a local elementary school.",
          "source_url": "https://inthesetimes.com/article/big-tech-artificial-intelligence-ai-data-center-protests",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "University of Michigan purchased about 125 acres at 10455 and 10635 Textile Road in June 2025",
          "source_url": "https://wdet.org/2026/09/11/ypsilanti-township-fight-over-u-m-computing-center-intensifies-with-moratorium/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Site covers 144 acres along Textile Road",
          "source_url": "https://wdet.org/2026/09/11/ypsilanti-township-fight-over-u-m-computing-center-intensifies-with-moratorium/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "University of Michigan and Los Alamos National Laboratory proposed computing center at 144 acre Ypsilanti Township site",
          "source_url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Nearly 50 residents spoke during Sept. 9 town hall opposing University of Michigan's proposed $1.2 billion research computing center",
          "source_url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "University of Michigan announced a partnership with Los Alamos National Laboratory to build a data center in Ypsilanti Township nearly two years ago",
          "source_url": "https://www.michigandaily.com/news/administration/we-dont-deserve-this-umich-town-hall-over-data-center-draws-severe-backlash-from-community-members/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Computing center is nearly 300,000 square feet with about 50,000 square feet reserved for U M's nonclassified research",
          "source_url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Saline Township hired acoustic engineer Darren Brown to independently review noise study for Oracle and OpenAI data center",
          "source_url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Next town hall for U M computing center scheduled for October 1, 2026",
          "source_url": "https://thesuntimesnews.com/weekly-data-center-watch-ypsilanti-township-residents-challenge-u-m/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "University of Michigan purchased nearly 20 acres at 10221 Textile Road in October 2024",
          "source_url": "https://wdet.org/2026/09/11/ypsilanti-township-fight-over-u-m-computing-center-intensifies-with-moratorium/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "The facility is proposed to be built on a 144 acre site",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "University of Michigan initially proposed 20 acre project before purchasing 124 additional acres",
          "source_url": "https://planetdetroit.org/2026/09/ypsilanti-township-uofm-data-center-opposition/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "A next town hall is scheduled for October 1",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "The facility is proposed to be built along the Huron River",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Data center being planned by University of Michigan in collaboration with Los Alamos National Laboratory",
          "source_url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "University of Michigan hosting town hall on September 9 for Ypsilanti Township residents about data center planned with Los Alamos National Laboratory",
          "source_url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-09",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "University of Michigan held town hall on September 9 to discuss proposed advanced research center in partnership with Los Alamos National Laboratory in Ypsilanti Township; hostile crowd expressed opposition calling it a data center by another name",
          "source_url": "https://www.michiganpublic.org/education/2026-09-10/um-town-hall-panel-faces-angry-jeering-crowd-over-plan-for-joint-computing-center-with-los-alamos",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "University of Michigan hosting town hall on September 9 for Ypsilanti Township residents on planned data center",
          "source_url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The University of Michigan proposed computing facility in Ypsilanti Township would cost $1.2 billion and be almost 300,000 square feet",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The project was first announced in 2024",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The facility would be almost 300,000 square feet with roughly 250,000 going to Los Alamos and about 50,000 square feet going to the university for nonclassified research",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "stalled",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed data center linked to the University of Michigan and Los Alamos National Laboratory near Ypsilanti and Van Buren Township has been stalled by a 6 month power moratorium imposed by the township, with protesters planning a gathering at the Ypsilanti and Van Buren Township line.",
          "source_url": "https://ytown.org/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "The planned data center covers roughly 220,000 square feet on a 144 acre site on Textile Road in Ypsilanti Township.",
          "source_url": "https://www.thecooldown.com/green-tech/michigan-ypsilanti-township-power-moratorium-data-center/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "University of Michigan selected a 144 acre site in Ypsilanti Township for a research computing center with Los Alamos National Laboratory",
          "source_url": "https://michiganadvance.com/2026/08/17/michigan-data-centers-the-weekly-download-3-2-2-2-2-2-2-2-2/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A 220,000 square foot hyperscale data center backed by the University of Michigan and Los Alamos National Laboratory was proposed in an Ypsilanti Township location, drawing opposition from the township which passed a ban on new electrical infrastructure.",
          "source_url": "https://ytown.org/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "University of Michigan proposed a 144 acre data center site in Ypsilanti Township",
          "source_url": "https://www.clickondetroit.com/video/news/2026/08/13/township-pushes-back-against-data-center-proposal/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "The facility would house an academic computing center for U M researchers and students as well as a federal research center supporting Los Alamos",
          "source_url": "https://www.clickondetroit.com/video/news/2026/08/13/township-pushes-back-against-data-center-proposal/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "University of Michigan selected a 144 acre site along Textile Road near Bridge Road in Ypsilanti Township for the data center",
          "source_url": "https://www.freep.com/story/news/environment/2026/08/12/university-michigan-los-alamos-national-laboratory-data-center-ypsilanti/91276431007/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "University of Michigan announced a site along Textile Road near the Huron River in Ypsilanti Township as the preferred location for a proposed data and research center with Los Alamos National Laboratory",
          "source_url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Ypsilanti Township residents and officials pushed back on a University of Michigan and Los Alamos National Laboratory data center proposed in the township.",
          "source_url": "https://ytown.org/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "The project is located on Textile Road and allows a world class research facility to serve the university and Los Alamos National Laboratory",
          "source_url": "https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "University of Michigan affirmed on Tuesday it plans to build a 1.2 billion dollar data center on 144 acres next to the Huron River in Ypsilanti Township",
          "source_url": "https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-16",
          "summary": "U M officials indicated they may make final decision between Textile Road site and former General Motors site near Willow Run in coming days",
          "source_url": "https://www.wemu.org/wemu-news/2026-07-16/ypsilanti-township-officials-vow-to-fight-to-stop-u-m-los-alamos-center-to-the-end",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-15",
          "summary": "A $1.25 billion research computing center is proposed by University of Michigan and Los Alamos National Laboratory in Ypsilanti Township.",
          "source_url": "https://www.wxyz.com/videos/news/data-centers/residents-and-officials-push-back-on-1-25b-university-of-michigan-data-center-plan",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "verrus-project-flex-lyon-township-data-center-mi",
      "name": "Verrus Project Flex Lyon Township Data Center",
      "summary": "Verrus submitted a site plan for Project Flex, a proposed data center campus along Milford Road in Lyon Township, Oakland County, Michigan.",
      "state": "MI",
      "city": "Lyon Township",
      "county": "Oakland County",
      "status": "proposed",
      "developer": "Verrus",
      "capacity_mw": null,
      "latitude": 42.4958,
      "longitude": -83.6285,
      "location_precision": "parcel",
      "location_source": "https://www.lyontwp.org/",
      "location_verified_at": null,
      "coordinate_source": "Charter Township of Lyon Milford Road site plan",
      "location_last_verified": null,
      "site_address": "Milford Road and Grand River Avenue, Lyon Township, MI 48165",
      "site_address_source_url": "https://www.lyontwp.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.lyontwp.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/verrus-project-flex-lyon-township-data-center-mi",
      "source": "https://planetdetroit.org/2026/07/data-center-news-saline-township/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center news: Saline Township reverses course, drops cap on data center tax break - Planet Detroit",
          "url": "https://planetdetroit.org/2026/07/data-center-news-saline-township/",
          "publisher": "Planet Detroit",
          "date": "2026-07-21",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-07-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verrus is seeking final approval for Project Flex, a data center on Milford Road in Lyon Township, offering a $10 million community benefits package.",
          "source_url": "https://planetdetroit.org/2026/07/data-center-news-saline-township/",
          "source_tier": 1
        }
      ]
    }
  ],
  "grid_region": {
    "code": "rfcm",
    "label": "RFCM",
    "name": "RFC Michigan",
    "kind": "dallas_fed_subregion",
    "parent_iso": "miso",
    "states": [
      "MI"
    ],
    "primary_states": [
      "MI"
    ],
    "price_effect_2025_mwh": 1.27,
    "price_effect_2025_pct": 3.8,
    "price_effect_2028_mwh": 2.89,
    "price_effect_2028_pct": 8.8,
    "own_dc_share_pct": 0.6,
    "fixed_cost_share": 0.681,
    "wholesale_price_effect_2025": "3.8 percent (+$1.27 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "8.8 percent (+$2.89 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "monitoring-analytics-pjm-2026q1",
      "study": "Monitoring Analytics, PJM Independent Market Monitor (Q1 2026 State of the Market Report)",
      "title": "2026 Quarterly State of the Market Report for PJM: January through March",
      "publisher": "Monitoring Analytics, LLC (PJM Independent Market Monitor)",
      "document_date": "May 14, 2026",
      "last_verified": "October 28, 2026",
      "source_type": "official record",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "PJM Base Residual Auction capacity market clearing prices and total wholesale capacity bill attributable to data center load",
      "finding": "Data center load growth was the primary driver of the PJM 2025/2026 and 2026/2027 capacity market tightness, accounting for $9.3 billion of the $14.7 billion total PJM capacity cost in the 2025/2026 delivery year and driving a 76 percent surge in PJM wholesale power costs in Q1 2026.",
      "years_covered": "2025 to 2027 delivery years and Q1 2026",
      "method": "Counterfactual PJM Base Residual Auction clearing runs removing forecast and existing data center peak load additions",
      "who_funded_or_published": "Monitoring Analytics, LLC (independent market monitor for PJM Interconnection, mandated by FERC)",
      "primary_url": "https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som-pjm.pdf",
      "corroborating_url": "https://www.eenews.net/articles/data-centers-drive-76-surge-in-pjm-power-prices/",
      "corroborating_label": "E&E News, May 15, 2026",
      "notes": "Applies specifically to the 13 state and District of Columbia PJM Interconnection footprint.",
      "scope_regions": [
        "pjm",
        "srvc-n",
        "rfce",
        "rfcw"
      ],
      "scope_states": [
        "VA",
        "PA",
        "OH",
        "MD",
        "NJ",
        "DE",
        "WV",
        "IN",
        "IL",
        "KY",
        "NC",
        "TN",
        "MI",
        "DC"
      ]
    },
    {
      "id": "ucs-pjm-connection-costs-2025",
      "study": "Union of Concerned Scientists, Billions of Dollars in Unreported Data Center Costs in PJM",
      "title": "Data Center Transmission Interconnection Costs in PJM",
      "publisher": "Union of Concerned Scientists",
      "document_date": "September 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Local transmission network upgrade costs triggered by data center interconnections in PJM",
      "finding": "In PJM alone, $4.36 billion in transmission upgrades across 150 supplemental transmission projects in 2024 were triggered by data center connections and socialized across regional utility ratepayers under PJM tariff rules.",
      "years_covered": "2022 to 2024 PJM transmission expansion filings",
      "method": "Project by project audit of PJM Regional Transmission Expansion Plan (RTEP) and utility Attachment M-3 supplemental project filings",
      "who_funded_or_published": "Union of Concerned Scientists (nonprofit advocacy group study)",
      "primary_url": "https://www.ucs.org/sites/default/files/2025-09/PJM%20Data%20Center%20Issue%20Brief%20-%20Sep%202025.pdf",
      "corroborating_url": "https://salatainstitute.harvard.edu/data-centers-ai-artificial-intelligence-grid-permitting-transmission-electricity-energy",
      "corroborating_label": "Harvard Salata Institute interview with Ari Peskoe, March 17, 2026",
      "notes": "Advocacy group issue brief auditing PJM supplemental transmission filings across Virginia, Ohio, Pennsylvania and Maryland.",
      "scope_regions": [
        "pjm",
        "srvc-n",
        "rfce",
        "rfcw"
      ],
      "scope_states": [
        "VA",
        "PA",
        "OH",
        "MD",
        "NJ",
        "DE",
        "WV",
        "IN",
        "IL",
        "KY",
        "NC",
        "TN",
        "MI",
        "DC"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}