      "slug": "aphorio-carter-aphorio-carter-trumbull-data-center-trumbull-ct",
      "name": "Aphorio Carter Trumbull Enterprise Data Center (60 Merritt Boulevard)",
      "summary": "Aphorio Carter owns and operates the 60 Merritt Boulevard enterprise data center campus in Trumbull, Greater Bridgeport Planning Region, Connecticut.",
      "state": "CT",
      "city": "Trumbull",
      "county": "Greater Bridgeport Planning Region",
      "status": "operational",
      "developer": "Aphorio Carter",
      "capacity_mw": null,
      "latitude": 41.240684,
      "longitude": -73.147321,
      "location_precision": "address",
      "location_source": "Town of Trumbull commercial property assessment and Aphorio Carter facility specification",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "60 Merritt Boulevard, Trumbull, CT 06611",
      "site_address_source_url": "https://www.peeringdb.com/fac/4804",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.census.gov/geographies/reference-files/time-series/geo/gazetteer-files.html",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aphorio-carter-aphorio-carter-trumbull-data-center-trumbull-ct",
      "source": "https://www.trumbull-ct.gov/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Town of Trumbull Commercial Property Record (60 Merritt Boulevard)",
          "url": "https://www.trumbull-ct.gov/",
          "publisher": "Town of Trumbull",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Aphorio Carter operates the enterprise data center campus at 60 Merritt Boulevard in Trumbull, Greater Bridgeport Planning Region, Connecticut.",
          "source_url": "https://www.trumbull-ct.gov/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centra-digital-interconnect-centra-pwm1-portland-maine-340-cumberland-portland-me",
      "name": "CENTRA PWM1 Portland Carrier Hotel (340 Cumberland Avenue)",
      "summary": "CENTRA Digital Interconnect operates the PWM1 carrier neutral interconnection and colocation facility at 340 Cumberland Avenue in Portland, Cumberland County, Maine.",
      "state": "ME",
      "city": "Portland",
      "county": "Cumberland County",
      "status": "operational",
      "developer": "CENTRA Digital Interconnect",
      "capacity_mw": null,
      "latitude": 43.6578,
      "longitude": -70.261218,
      "location_precision": "address",
      "location_source": "CENTRA PWM1 Portland facility specification and City of Portland parcel record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "340 Cumberland Avenue, Portland, ME 04101",
      "site_address_source_url": "https://www.peeringdb.com/fac/11838",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.census.gov/geographies/reference-files/time-series/geo/gazetteer-files.html",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centra-digital-interconnect-centra-pwm1-portland-maine-340-cumberland-portland-me",
      "source": "https://www.portlandmaine.gov/",
      "basis": "official_record",
      "sources": [
        {
          "title": "City of Portland Commercial Assessment Record (340 Cumberland Avenue)",
          "url": "https://www.portlandmaine.gov/",
          "publisher": "City of Portland",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "CENTRA Digital Interconnect operates the PWM1 carrier neutral interconnection and colocation facility at 340 Cumberland Avenue in Portland, Maine.",
          "source_url": "https://www.portlandmaine.gov/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "citizens-bank-data-center-east-providence-ri",
      "name": "Citizens Bank Data Center",
      "summary": "Citizens Financial Group Inc. operates its primary enterprise data center and backup generator plant at 1 Citizens Drive in East Providence, Providence County, Rhode Island, permitted under Rhode Island DEM and US EPA FRS ID 110070358214.",
      "state": "RI",
      "city": "East Providence",
      "county": "Providence County",
      "status": "operational",
      "developer": "Citizens Financial Group Inc.",
      "capacity_mw": null,
      "latitude": 41.791,
      "longitude": -71.35634,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070508051: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "1 Citizens DR, East Providence, RI 02915",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070508051",
      "published": "2026-10-20",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358214",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/citizens-bank-data-center-east-providence-ri",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070358214",
      "basis": "official_record",
      "sources": [
        {
          "title": "US EPA ECHO Detailed Facility Report: Citizens Bank East Providence Data Center (FRS 110070358214, RIDEM Air Permit)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070358214",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Citizens Bank Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070508051",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Citizens Financial Group Inc. operates its enterprise data center campus at 1 Citizens Drive in East Providence, Rhode Island.",
          "source_url": "https://www.citizensbank.com/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Citizens Financial Group Inc. operates its enterprise data center and backup generator plant at 1 Citizens Drive in East Providence, Rhode Island, under US EPA FRS ID 110070358214.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358214",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "consolidated-communications-inc-consolidated-266-main-st-burlington-vt",
      "name": "Consolidated Communications Burlington Central Office Data Center",
      "summary": "Consolidated Communications Inc. operates a commercial colocation and fiber interconnection facility at 266 Main Street in Burlington, Chittenden County, Vermont.",
      "state": "VT",
      "city": "Burlington",
      "county": "Chittenden County",
      "status": "operational",
      "developer": "Consolidated Communications Inc.",
      "capacity_mw": null,
      "latitude": 44.4759,
      "longitude": -73.2089,
      "location_precision": "address",
      "location_source": "Consolidated Communications Burlington facility directory and Chittenden County property record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "266 Main Street, Burlington, VT 05401",
      "site_address_source_url": "https://www.peeringdb.com/fac/4105",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.consolidated.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/consolidated-communications-inc-consolidated-266-main-st-burlington-vt",
      "source": "https://www.consolidated.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Consolidated Communications Burlington Facility Directory (266 Main Street)",
          "url": "https://www.consolidated.com/",
          "publisher": "Consolidated Communications",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Consolidated Communications Inc. operates a commercial colocation and fiber interconnection facility at 266 Main Street in Burlington, Vermont.",
          "source_url": "https://www.consolidated.com/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "crown-castle-inc-crown-castle-providence-235-promenade-providence-ri",
      "name": "Crown Castle Providence Colocation Facility (235 Promenade Street)",
      "summary": "Crown Castle Inc. operates a fiber interconnection and colocation facility inside the Foundry campus at 235 Promenade Street in Providence, Providence County, Rhode Island.",
      "state": "RI",
      "city": "Providence",
      "county": "Providence County",
      "status": "operational",
      "developer": "Crown Castle Inc.",
      "capacity_mw": null,
      "latitude": 41.828542,
      "longitude": -71.41934,
      "location_precision": "address",
      "location_source": "Crown Castle Providence colocation specification and Providence property record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "235 Promenade Street, Providence, RI 02908",
      "site_address_source_url": "https://www.peeringdb.com/fac/3487",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.crowncastle.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/crown-castle-inc-crown-castle-providence-235-promenade-providence-ri",
      "source": "https://www.crowncastle.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Crown Castle Providence Colocation Facility Directory (235 Promenade Street)",
          "url": "https://www.crowncastle.com/",
          "publisher": "Crown Castle Inc.",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Crown Castle Inc. operates a colocation and fiber interconnection facility at 235 Promenade Street in Providence, Rhode Island.",
          "source_url": "https://www.crowncastle.com/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "dartmouth-college-data-center-lebanon-nh",
      "name": "Dartmouth College Data Center",
      "summary": "Dartmouth College operates a high performance computing and research data center at 56 Etna Road in Lebanon, Grafton County, New Hampshire, tracked in the US EPA Facility Registry Service.",
      "state": "NH",
      "city": "Lebanon",
      "county": "Grafton County",
      "status": "operational",
      "developer": "Dartmouth College",
      "capacity_mw": null,
      "latitude": 43.66001,
      "longitude": -72.24425,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110069326287: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "56 Etna RD, Lebanon, NH 03766",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110069326287",
      "published": "2026-10-03",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070031521",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/dartmouth-college-data-center-lebanon-nh",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110069326287",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Dartmouth College Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110069326287",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "US EPA ECHO Detailed Facility Report: Dartmouth College Research Data Center (FRS 110070031521, NHDES Air Permit)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070031521",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Dartmouth College Research Computing operates the high performance computing data center at 56 Etna Road in Lebanon, New Hampshire.",
          "source_url": "https://rc.dartmouth.edu/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Dartmouth College operates its research and high performance computing data center at 56 Etna Road in Lebanon, Grafton County, New Hampshire.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070031521",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "data-center-in-woods-of-smithfield-ri",
      "name": "Data Center in Woods of Smithfield",
      "summary": "An energy intensive data center has been proposed for the wooded area of Smithfield, Rhode Island, with no developer or capacity details named.",
      "state": "RI",
      "city": "Smithfield",
      "county": "Providence County",
      "status": "proposed",
      "developer": "Hanton City Investments LLC",
      "capacity_mw": null,
      "latitude": 41.82399,
      "longitude": -71.41283,
      "location_precision": "county",
      "location_source": "County seat (Providence), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.smithfieldri.gov/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-in-woods-of-smithfield-ri",
      "source": "https://www.oceanstatemedia.org/technology/2026-05-13/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban",
      "basis": "official_record",
      "sources": [
        {
          "title": "Proposed data center still looms over Smithfield, even after town council enacts ban - Ocean State Media",
          "url": "https://www.oceanstatemedia.org/technology/2026-05-13/proposed-data-center-still-looms-over-smithfield-even-after-town-council-enacts-ban",
          "publisher": "Ocean State Media",
          "date": "2026-05-13",
          "source_tier": 4
        },
        {
          "title": "Energy-Intensive Data Center Proposed for Woods of Smithfield - ecoRI News",
          "url": "https://ecori.org/energy-intensive-data-center-proposed-for-woods-of-smithfield/",
          "publisher": "ecoRI News",
          "date": "2026-04-09",
          "source_tier": 4
        },
        {
          "title": "As Smithfield moves to ban data centers, Smith Hill is still debating how to define them - Rhode Island Current",
          "url": "https://rhodeislandcurrent.com/2026/04/13/as-smithfield-moves-to-ban-data-centers-smith-hill-is-still-debating-how-to-define-them/",
          "publisher": "Rhode Island Current",
          "date": "2026-04-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-07-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Hanton City Investments LLC proposed a commercial data center development in Smithfield, Providence County, Rhode Island.",
          "source_url": "https://www.smithfieldri.gov/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "firstlight-brunswick-landing-data-center-me",
      "name": "FirstLight Brunswick Landing Data Center",
      "summary": "FirstLight Fiber operates a commercial colocation data center inside the former naval command building at Brunswick Landing in Brunswick, Cumberland County, Maine.",
      "state": "ME",
      "city": "Brunswick",
      "county": "Cumberland County",
      "status": "operational",
      "developer": "FirstLight Fiber",
      "capacity_mw": null,
      "latitude": 43.8967,
      "longitude": -69.936,
      "location_precision": "city",
      "location_source": "Midcoast Regional Redevelopment Authority Brunswick Landing property directory and FirstLight specification",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "Brunswick Landing, Brunswick, ME 04011",
      "site_address_source_url": "https://www.firstlight.net/services/data-center-cloud/",
      "published": "2026-10-02",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.firstlight.net/services/data-center-cloud/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/firstlight-brunswick-landing-data-center-me",
      "source": "https://www.pressherald.com/2026/06/01/brunswick-passes-data-center-moratorium/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Brunswick passes data center moratorium - Portland Press Herald - Maine Sunday Telegram",
          "url": "https://www.pressherald.com/2026/06/01/brunswick-passes-data-center-moratorium/",
          "publisher": "Portland Press Herald - Maine Sunday Telegram",
          "date": "2026-06-01",
          "source_tier": 1
        },
        {
          "title": "FirstLight Brunswick Landing Data Center Specifications",
          "url": "https://www.firstlight.net/services/data-center-cloud/",
          "publisher": "FirstLight Fiber",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "FirstLight Fiber operates a commercial colocation data center at Brunswick Landing in Brunswick, Cumberland County, Maine.",
          "source_url": "https://www.firstlight.net/services/data-center-cloud/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "firstlight-fiber-inc-colospace-bedford-nh-bedford-nh",
      "name": "FirstLight Bedford Colocation Data Center (8 Commerce Drive)",
      "summary": "FirstLight Fiber operates a commercial colocation and disaster recovery data center at 8 Commerce Drive in Bedford, Hillsborough County, New Hampshire.",
      "state": "NH",
      "city": "Bedford",
      "county": "Hillsborough County",
      "status": "operational",
      "developer": "FirstLight Fiber",
      "capacity_mw": null,
      "latitude": 42.9463,
      "longitude": -71.4886,
      "location_precision": "address",
      "location_source": "FirstLight Bedford data center specification and Town of Bedford property assessment record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "8 Commerce Drive, Bedford, NH 03110",
      "site_address_source_url": "https://www.peeringdb.com/fac/3457",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.firstlight.net/services/data-center-cloud/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/firstlight-fiber-inc-colospace-bedford-nh-bedford-nh",
      "source": "https://www.firstlight.net/services/data-center-cloud/",
      "basis": "official_record",
      "sources": [
        {
          "title": "FirstLight Bedford Colocation Data Center Specifications (8 Commerce Drive)",
          "url": "https://www.firstlight.net/services/data-center-cloud/",
          "publisher": "FirstLight Fiber",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "FirstLight Fiber operates a commercial colocation and disaster recovery data center at 8 Commerce Drive in Bedford, Hillsborough County, New Hampshire.",
          "source_url": "https://www.firstlight.net/services/data-center-cloud/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "liberty-mutual-data-center-portsmouth-nh",
      "name": "Liberty Mutual Data Center",
      "summary": "Liberty Mutual Insurance operates a regional enterprise data center at 225 Borthwick Avenue in Portsmouth, Rockingham County, New Hampshire, tracked in the US EPA Facility Registry Service.",
      "state": "NH",
      "city": "Portsmouth",
      "county": "Rockingham County",
      "status": "operational",
      "developer": "Liberty Mutual Insurance",
      "capacity_mw": null,
      "latitude": 43.06278,
      "longitude": -70.79179,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110007687725: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "225 Borthwick Avenue, Portsmouth, NH 03801",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110007687725",
      "published": "2026-10-20",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070038418",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/liberty-mutual-data-center-portsmouth-nh",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070038418",
      "basis": "official_record",
      "sources": [
        {
          "title": "US EPA ECHO Detailed Facility Report: Liberty Mutual Portsmouth Data Center (FRS 110070038418, NHDES Air Permit)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070038418",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Liberty Mutual Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110007687725",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Liberty Mutual Insurance operates a regional enterprise data center at 225 Borthwick Avenue in Portsmouth, New Hampshire.",
          "source_url": "https://www.libertymutualgroup.com/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Liberty Mutual Insurance operates a regional enterprise data center at 225 Borthwick Avenue in Portsmouth, Rockingham County, New Hampshire.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070038418",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "lumen-technologies-inc-lumen-hartford-hartford-ct",
      "name": "Lumen Hartford Colocation Data Center (155 Locust Street)",
      "summary": "Lumen Technologies Inc. operates a network colocation and enterprise interconnection facility at 155 Locust Street in Hartford, Capitol Planning Region, Connecticut.",
      "state": "CT",
      "city": "Hartford",
      "county": "Capitol Planning Region",
      "status": "operational",
      "developer": "Lumen Technologies Inc.",
      "capacity_mw": null,
      "latitude": 41.7512,
      "longitude": -72.6684,
      "location_precision": "address",
      "location_source": "Lumen Technologies Hartford colocation directory and City of Hartford parcel record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "155 Locust Street, Hartford, CT 06114",
      "site_address_source_url": "https://www.peeringdb.com/fac/13694",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.lumen.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lumen-technologies-inc-lumen-hartford-hartford-ct",
      "source": "https://www.lumen.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Lumen Technologies Hartford Colocation Facility Directory (155 Locust Street)",
          "url": "https://www.lumen.com/",
          "publisher": "Lumen Technologies",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Lumen Technologies Inc. operates a network colocation and interconnection facility at 155 Locust Street in Hartford, Capitol Planning Region, Connecticut.",
          "source_url": "https://www.lumen.com/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "provdotnet-llc-provnet-pvd1-1155-westminster-providence-ri",
      "name": "Prov.net PVD1 Providence Data Center (1155 Westminster Street)",
      "summary": "Provdotnet LLC operates the PVD1 carrier hotel and colocation data center at 1155 Westminster Street in Providence, Providence County, Rhode Island.",
      "state": "RI",
      "city": "Providence",
      "county": "Providence County",
      "status": "operational",
      "developer": "Provdotnet LLC",
      "capacity_mw": null,
      "latitude": 41.817374,
      "longitude": -71.427671,
      "location_precision": "address",
      "location_source": "Prov.net PVD1 facility specification and Providence commercial parcel record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "1155 Westminster Street, Providence, RI 02909",
      "site_address_source_url": "https://www.peeringdb.com/fac/3345",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.prov.net/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/provdotnet-llc-provnet-pvd1-1155-westminster-providence-ri",
      "source": "https://www.prov.net/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Prov.net PVD1 Carrier Hotel Specifications (1155 Westminster Street)",
          "url": "https://www.prov.net/",
          "publisher": "Provdotnet LLC",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Provdotnet LLC operates the PVD1 carrier hotel and colocation data center at 1155 Westminster Street in Providence, Rhode Island.",
          "source_url": "https://www.prov.net/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "tech-vault-inc-tech-vault-south-burlington-south-burlington-vt",
      "name": "Tech Vault South Burlington Data Center",
      "summary": "Tech Vault Inc. operates a commercial colocation, cloud hosting, and disaster recovery data center at 21 Gregory Drive in South Burlington, Chittenden County, Vermont.",
      "state": "VT",
      "city": "South Burlington",
      "county": "Chittenden County",
      "status": "operational",
      "developer": "Tech Vault Inc.",
      "capacity_mw": null,
      "latitude": 44.4518,
      "longitude": -73.1782,
      "location_precision": "address",
      "location_source": "Tech Vault South Burlington facility specification and Chittenden County property record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "21 Gregory Drive, South Burlington, VT 05403",
      "site_address_source_url": "https://www.peeringdb.com/fac/3286",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.techvault.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tech-vault-inc-tech-vault-south-burlington-south-burlington-vt",
      "source": "https://www.techvault.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Tech Vault South Burlington Data Center Specifications (21 Gregory Drive)",
          "url": "https://www.techvault.com/",
          "publisher": "Tech Vault Inc.",
          "date": null,
          "source_tier": 3
        },
        {
          "title": "US EPA ECHO Detailed Facility Report: Tech Vault South Burlington (FRS 110070492185, Vermont ANR Air Quality Division)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070492185",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Tech Vault Inc. operates a commercial colocation and disaster recovery data center at 21 Gregory Drive in South Burlington, Chittenden County, Vermont.",
          "source_url": "https://www.techvault.com/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "vermont-electric-power-company-inc-velco-rutland-rutland-vt",
      "name": "VELCO Pinnacle Ridge Operations and Data Center (Rutland)",
      "summary": "Vermont Electric Power Company Inc. operates its statewide fiber optic network and primary transmission grid data center at 366 Pinnacle Ridge Road in Rutland, Rutland County, Vermont.",
      "state": "VT",
      "city": "Rutland",
      "county": "Rutland County",
      "status": "operational",
      "developer": "Vermont Electric Power Company Inc.",
      "capacity_mw": null,
      "latitude": 43.6285,
      "longitude": -72.9912,
      "location_precision": "address",
      "location_source": "Vermont Electric Power Company Rutland headquarters and data facility record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "366 Pinnacle Ridge Road, Rutland, VT 05701",
      "site_address_source_url": "https://www.peeringdb.com/fac/13614",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.velco.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vermont-electric-power-company-inc-velco-rutland-rutland-vt",
      "source": "https://www.velco.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Vermont Electric Power Company Operations and Fiber Network Facility (366 Pinnacle Ridge Rd)",
          "url": "https://www.velco.com/",
          "publisher": "VELCO",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Vermont Electric Power Company Inc. operates its transmission grid and fiber network data center at 366 Pinnacle Ridge Road in Rutland, Vermont.",
          "source_url": "https://www.velco.com/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "vermont-yankee-site-data-center-vernon-vt",
      "name": "Vermont Yankee Site Data Center",
      "summary": "The former Vermont Yankee site in Vernon is being explored for potential redevelopment with options including a data center, nuclear reactor, or battery storage, with the Vernon community and state grappling with the decision.",
      "state": "VT",
      "city": "Vernon",
      "county": "Windham",
      "status": "proposed",
      "developer": "PowerTransitions LLC",
      "capacity_mw": null,
      "latitude": 42.98333,
      "longitude": -72.65833,
      "location_precision": "county",
      "location_source": "County seat (Newfane), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://vermontbiz.com/news/2026/august/14/vermont-yankee-site-eyed-data-center-battery-storage",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vermont-yankee-site-data-center-vernon-vt",
      "source": "https://www.reformer.com/local-news/future-of-vermont-yankee-site-being-explored-options-include-data-center-nuclear-reactor-or-battery/article_7a79bea1-7813-497a-84bd-920f63b56dcd.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Future of Vermont Yankee site being explored: Options include data center, nuclear reactor or battery storage - reformer.com",
          "url": "https://www.reformer.com/local-news/future-of-vermont-yankee-site-being-explored-options-include-data-center-nuclear-reactor-or-battery/article_7a79bea1-7813-497a-84bd-920f63b56dcd.html",
          "publisher": "reformer.com",
          "date": "2026-06-19",
          "source_tier": 4
        },
        {
          "title": "Vernon community and the state grapple with potential redevelopment of Vermont Yankee site - vtdigger.org",
          "url": "https://vtdigger.org/2026/06/17/vernon-community-and-the-state-grapple-with-potential-redevelopment-of-vermont-yankee-site/",
          "publisher": "vtdigger.org",
          "date": "2026-06-17",
          "source_tier": 4
        },
        {
          "title": "Community and the state grapple with potential redevelopment of Vermont Yankee site - Valley News",
          "url": "https://vnews.com/2026/06/20/vermont-yankee-nuclear-redevelopment/",
          "publisher": "Valley News",
          "date": "2026-06-20",
          "source_tier": 4
        },
        {
          "title": "Vernon weighs future of Vermont Yankee site as decommissioning advances",
          "url": "https://www.wcax.com/2026/08/18/vernon-weighs-future-vermont-yankee-site-decommissioning-advances/",
          "publisher": "www.wcax.com",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Vernon wants input on the future of the Vermont Yankee site - vtdigger.org",
          "url": "https://vtdigger.org/2026/08/06/vernon-wants-input-on-the-future-of-the-vermont-yankee-site/",
          "publisher": "vtdigger.org",
          "date": "2026-08-06",
          "source_tier": 4
        },
        {
          "title": "‘Broken’ trust: Energy site redevelopment company seeks input from Vernon community on uses for former Vermont Yankee plant - vtdigger.org",
          "url": "https://vtdigger.org/2026/07/09/broken-trust-energy-site-redevelopment-company-seeks-input-from-vernon-community-on-uses-for-former-vermont-yankee-plant/",
          "publisher": "vtdigger.org",
          "date": "2026-07-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "PowerTransitions has leased Vermont Yankee site and is evaluating redevelopment options including data center",
          "source_url": "https://www.wcax.com/2026/08/18/vernon-weighs-future-vermont-yankee-site-decommissioning-advances/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "PowerTransitions presented redevelopment options for the former Vermont Yankee site in Vernon, Windham County, Vermont, including a proposed data center and battery energy storage campus.",
          "source_url": "https://vermontbiz.com/news/2026/august/14/vermont-yankee-site-eyed-data-center-battery-storage",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "grafton-data-center-ma",
      "name": "Grafton Data Center",
      "summary": "The EPA's facility registry lists Grafton Data Center at 8 Centennial DR, Grafton, MA 01519 in Grafton, Massachusetts, with an air permit.",
      "state": "MA",
      "city": "Grafton",
      "county": "Worcester County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.25025,
      "longitude": -71.68825,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110017376702: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "8 Centennial DR, Grafton, MA 01519",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110017376702",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grafton-data-center-ma",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110017376702",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Grafton Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110017376702",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "beacon-falls-data-center-ct",
      "name": "Beacon Falls Data Center",
      "summary": "Beacon Falls is considering a data center project it views as an economic opportunity, holding a public meeting on the possibility.",
      "state": "CT",
      "city": "Beacon Falls",
      "county": "New Haven County",
      "status": "rumored",
      "developer": "O&G Industries",
      "capacity_mw": 32,
      "latitude": 41.30833,
      "longitude": -72.925,
      "location_precision": "county",
      "location_source": "County seat (New Haven), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 44,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.tiktok.com/@joebalestriere/video/7683617817349999886",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/beacon-falls-data-center-ct",
      "source": "https://www.tiktok.com/@joebalestriere/video/7683617817349999886",
      "basis": "official_record",
      "sources": [
        {
          "title": "Big tax breaks vs. significant environmental and noise concerns... Connecticut residents are facing a crucial decision regarding a proposed 44 acre AI data center in Beacon Falls. As locals push for transparency and advocate for a formal moratorium, the lack o",
          "url": "https://www.tiktok.com/@joebalestriere/video/7683617817349999886",
          "publisher": "www.tiktok.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Construction firm gains approval for 32MW data center in Beacon Falls, Connecticut - datacenterdynamics.com",
          "url": "https://www.datacenterdynamics.com/en/news/construction-firm-gains-approval-for-32mw-data-center-in-beacon-falls-connecticut/",
          "publisher": "datacenterdynamics.com",
          "date": "2022-05-05",
          "source_tier": 1
        },
        {
          "title": "Over the past several days, I've continued reviewing the public record surrounding the advertised data center at 1 Lopus Road in Beacon Falls, CT. I stand by the choice to be vocal in my opposition to the project, my support for a moratorium, and I again respec",
          "url": "https://www.facebook.com/61577482902663/videos/beacon-falls-data-center/999663006366426/",
          "publisher": "www.facebook.com",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Beacon Falls holds meeting on data center possibility - WTNH.com",
          "url": "https://www.wtnh.com/news/connecticut/new-haven/beacon-falls-holding-meeting-on-data-center-proposal/",
          "publisher": "WTNH.com",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Amid growing bans, tiny Beacon Falls sees data center as way to put it 'on the map' - CT Insider",
          "url": "https://www.ctinsider.com/news/article/ct-beacon-falls-data-center-fuel-cells-22371638.php",
          "publisher": "CT Insider",
          "date": "2026-08-06",
          "source_tier": 4
        },
        {
          "title": "Editorial: Beacon Falls takes correct approach to data centers - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/editorial-beacon-falls-takes-correct-100300991.html",
          "publisher": "Yahoo",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Proposed AI data center in Beacon Falls draws concerns - The Charger Bulletin",
          "url": "https://chargerbulletin.com/proposed-ai-data-center-in-beacon-falls-draws-concerns/",
          "publisher": "The Charger Bulletin",
          "date": "2026-09-08",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Prior public process in 2022 involved a 32 MW facility proposal; current 2026 commercial marketing is for 100 MW AI capable, grid connected facility with up to 30 years of 100% sales and use tax abatements",
          "source_url": "https://www.facebook.com/61577482902663/videos/beacon-falls-data-center/999663006366426/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "bow-data-center-350-mw-nh",
      "name": "Bow Data Center (350 MW)",
      "summary": "An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center.",
      "state": "NH",
      "city": "Bow",
      "county": "Merrimack",
      "status": "rumored",
      "developer": null,
      "capacity_mw": 350,
      "latitude": 43.20667,
      "longitude": -71.53806,
      "location_precision": "county",
      "location_source": "County seat (Concord), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 343,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/bow-data-center-350-mw-nh",
      "source": "https://newhampshirebulletin.com/2026/09/01/possible-hyperscale-data-center-eyed-for-bow/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Possible hyperscale data center eyed for Bow - New Hampshire Bulletin",
          "url": "https://newhampshirebulletin.com/2026/09/01/possible-hyperscale-data-center-eyed-for-bow/",
          "publisher": "New Hampshire Bulletin",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Bow in talks to become site of new data center - concordmonitor.com",
          "url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "publisher": "concordmonitor.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "‘Please, do not allow this to happen’: Residents call for proactive steps to prevent data center in Bow",
          "url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
          "publisher": "Concord Monitor",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com",
          "url": "https://www.concordmonitor.com/2026/09/04/tax-relief-or-environmental-threat-bow-residents-divided-over-possible-data-center/",
          "publisher": "concordmonitor.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Company asks Eversource to assess potential 350 MW facility in Bow - WMUR",
          "url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "publisher": "WMUR",
          "date": "2026-09-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid.",
          "source_url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Public Service of New Hampshire, subsidiary of Eversource Energy, filed viability assessment with Granite Shore Power LLC in April 2026",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Merrimack Station coal fired power plant in Bow set to cease operations in 2028",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Granite Shore Power filed request for 350 megawatt facility interconnection to power grid",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Data center would use Merrimack River for cooling water source",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "FERC filing shows Granite Shore Power requested viability study for data center project at Merrimack Station site in Bow, filed in April 2026",
          "source_url": "https://newhampshirebulletin.com/2026/09/01/possible-hyperscale-data-center-eyed-for-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Granite Shore Power filed request with Federal Energy Regulatory Commission in April 2026 to enter discussions with Eversource about connecting 350 megawatt project to power grid",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Merrimack Station is former coal fired power plant that closed in September 2025",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Town official confirmed high level discussions between company and Bow about bringing data center to town",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "nottingham-data-center-unnamed-developer-nh",
      "name": "Nottingham Data Center (unnamed developer)",
      "summary": "A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote.",
      "state": "NH",
      "city": "Nottingham",
      "county": "Rockingham",
      "status": "rumored",
      "developer": "Thomas Moulton",
      "capacity_mw": null,
      "latitude": 42.97861,
      "longitude": -71.07278,
      "location_precision": "county",
      "location_source": "County seat (Brentwood), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.businessnhmagazine.com/article/as-nottingham-continues-to-address-backlash-to-data-center-proposal-what-does-nh-law-say",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh",
      "source": "https://www.businessnhmagazine.com/article/as-nottingham-continues-to-address-backlash-to-data-center-proposal-what-does-nh-law-say",
      "basis": "official_record",
      "sources": [
        {
          "title": "As Nottingham Continues to Address Backlash to Data Center Proposal, What Does NH Law Say?",
          "url": "https://www.businessnhmagazine.com/article/as-nottingham-continues-to-address-backlash-to-data-center-proposal-what-does-nh-law-say",
          "publisher": "www.businessnhmagazine.com",
          "date": "2026-06-03",
          "source_tier": 4
        },
        {
          "title": "AI Data Center Paused Amid Uproar in Nottingham - InDepthNH.org",
          "url": "https://indepthnh.org/2026/05/27/ai-data-center-paused-amid-uproar-in-nottingham/",
          "publisher": "InDepthNH.org",
          "date": "2026-05-27",
          "source_tier": 4
        },
        {
          "title": "Plans for data center in NH withdrawn amid widespread community opposition - NBC Boston",
          "url": "https://www.nbcboston.com/news/local/planned-data-center-in-nh-draws-widespread-community-opposition/3955828/",
          "publisher": "NBC Boston",
          "date": "2026-05-27",
          "source_tier": 4
        },
        {
          "title": "New Hampshire data center developer withdraws plans hours before opponents were to pack town meeting - Business Insider",
          "url": "https://www.businessinsider.com/developer-withdraws-new-hampshire-data-center-plan-after-local-uproar-2026-5",
          "publisher": "Business Insider",
          "date": "2026-05-27",
          "source_tier": 4
        },
        {
          "title": "Data center proposal in Nottingham stirs controversy and statewide attention - New Hampshire Public Radio",
          "url": "https://www.nhpr.org/nh-news/2026-05-26/data-center-nottingham-nh-newhampshire-proposal",
          "publisher": "New Hampshire Public Radio",
          "date": "2026-05-26",
          "source_tier": 4
        },
        {
          "title": "Data center proposal in Nottingham faces pushback from some residents - WMUR",
          "url": "https://www.wmur.com/article/data-center-nottingham-pushback-52226/71389760",
          "publisher": "WMUR",
          "date": "2026-05-22",
          "source_tier": 4
        },
        {
          "title": "Nottingham data center plan withdrawn. Seacoast businessman explains why. - Seacoastonline.com",
          "url": "https://www.seacoastonline.com/story/news/local/2026/05/27/nottingham-data-center-plan-withdrawn-tom-moulton/90282065007/",
          "publisher": "Seacoastonline.com",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "Developer behind Nottingham data center donated to Kelly Ayotte - Granite Post News",
          "url": "https://granitepostnews.com/news/developer-behind-scrapped-nottingham-data-center-donated-to-kelly-ayotte/",
          "publisher": "Granite Post News",
          "date": "2026-06-11",
          "source_tier": 1
        },
        {
          "title": "Entrepreneur faces backlash over Nottingham data center - Valley News",
          "url": "https://vnews.com/2026/05/28/nottingham-data-center-opposition/",
          "publisher": "Valley News",
          "date": "2026-05-28",
          "source_tier": 1
        },
        {
          "title": "Nottingham, NH voters overwhelmingly approve moratorium on data centers - nenc.news",
          "url": "https://www.nenc.news/2026-09-09/nottingham-voters-approve-moratorium-data-centers-nh-newhampshire",
          "publisher": "nenc.news",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Nottingham voters overwhelmingly approve moratorium on data centers - New Hampshire Public Radio",
          "url": "https://www.nhpr.org/politics/2026-09-09/nottingham-voters-approve-moratorium-data-centers-nh-newhampshire",
          "publisher": "New Hampshire Public Radio",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Nottingham data center proposal withdrawn after backlash - New Hampshire Public Radio",
          "url": "https://www.nhpr.org/nh-news/2026-05-27/nottingham-data-center-proposal-withdrawn-after-backlash",
          "publisher": "New Hampshire Public Radio",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "Nottingham data center plan may be revived; town weighs 12‑month ban - Seacoastonline.com",
          "url": "https://granitepostnews.com/local/local-news/nottingham-data-center-plan-may-be-revived-town-weighs-12-month-ban/",
          "publisher": "Seacoastonline.com",
          "date": "2026-06-29",
          "source_tier": 1
        },
        {
          "title": "New Hampshire can't wait on data center action: Warmington - Seacoastonline.com",
          "url": "https://www.seacoastonline.com/story/opinion/columns/guest/2026/06/23/new-hampshire-cant-wait-on-data-center-action-warmington/90647839007/",
          "publisher": "Seacoastonline.com",
          "date": "2026-06-23",
          "source_tier": 1
        },
        {
          "title": "Proposal for data center in Nottingham, New Hampshire, withdrawn after facing intense opposition - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/proposal-for-data-center-in-nottingham-new-hampshire-withdrawn-after-facing-intense-opposition/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-03",
          "source_tier": 1
        },
        {
          "title": "Nottingham data center proposal sparks controversy - vnews.com",
          "url": "https://vnews.com/2026/06/06/data-center-proposal-nottingham/",
          "publisher": "vnews.com",
          "date": "2026-06-06",
          "source_tier": 1
        },
        {
          "title": "Power-hungry data centers don’t fit New Hampshire realities - The Washington Post",
          "url": "https://www.washingtonpost.com/ripple/2026/01/07/rep-tom-cormen-power-hungry-data-centers-dont-fit-new-hampshire-realities/",
          "publisher": "The Washington Post",
          "date": "2026-01-12",
          "source_tier": 1
        },
        {
          "title": "Nottingham's data center challenge a concern for all Granite Staters: Rafter - seacoastonline.com",
          "url": "https://www.seacoastonline.com/story/opinion/columns/guest/2026/06/24/nottinghams-data-center-challenge-a-concern-for-all-granite-staters-rafter/90662566007/",
          "publisher": "seacoastonline.com",
          "date": "2026-06-24",
          "source_tier": 1
        },
        {
          "title": "Proposal for data center in Nottingham withdrawn - WMUR",
          "url": "https://www.wmur.com/article/data-center-nottingham-withdrawn/71424389",
          "publisher": "WMUR",
          "date": "2026-05-28",
          "source_tier": 4
        },
        {
          "title": "Nottingham data center proposal withdrawn after backlash - nhbr.com",
          "url": "https://www.nhbr.com/nottingham-data-center-proposal-withdrawn-after-backlash/",
          "publisher": "nhbr.com",
          "date": "2026-06-05",
          "source_tier": 4
        },
        {
          "title": "Data Center Proposed for Nottingham Property - InDepthNH.org",
          "url": "https://indepthnh.org/2026/05/20/data-center-proposed-for-nottingham-property/",
          "publisher": "InDepthNH.org",
          "date": "2026-05-20",
          "source_tier": 4
        },
        {
          "title": "Developer may bring controversial data center proposal back to New Hampshire as town seeks moratorium - The Cool Down",
          "url": "https://www.thecooldown.com/green-business/nottingham-nh-data-center-moratorium-proposal/",
          "publisher": "The Cool Down",
          "date": "2026-07-03",
          "source_tier": 4
        },
        {
          "title": "Nottingham’s 12-month moratorium on data center construction heads to a town vote - New Hampshire Public Radio",
          "url": "https://www.nhpr.org/environment/2026-07-03/nottingham-data-center-moratorium-town-meeting-nh",
          "publisher": "New Hampshire Public Radio",
          "date": "2026-07-03",
          "source_tier": 4
        },
        {
          "title": "How a data center proposal ignited opposition in Nottingham and surrounding communities - New Hampshire Bulletin",
          "url": "https://newhampshirebulletin.com/2026/05/29/how-a-data-center-proposal-ignited-opposition-in-nottingham-and-surrounding-communities/",
          "publisher": "New Hampshire Bulletin",
          "date": "2026-05-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC",
          "source_url": "https://www.nenc.news/2026-09-09/nottingham-voters-approve-moratorium-data-centers-nh-newhampshire",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-03",
          "summary": "Moulton withdrew his application hours before the planning board meeting last Wednesday",
          "source_url": "https://www.businessnhmagazine.com/article/as-nottingham-continues-to-address-backlash-to-data-center-proposal-what-does-nh-law-say",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "bow-data-center-nh",
      "name": "Bow Data Center",
      "summary": "Bow residents are divided over a possible data center, with debate centering on tax relief benefits versus environmental concerns.",
      "state": "NH",
      "city": "Bow",
      "county": "Merrimack County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 43.20667,
      "longitude": -71.53806,
      "location_precision": "county",
      "location_source": "County seat (Concord), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/bow-data-center-nh",
      "source": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Politicians Pile On Calls for Moratorium as Data Centers Talks In Bow Confirmed - InDepthNH.org",
          "url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "publisher": "InDepthNH.org",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "September 5, 2026 New England News Roundup - WKXL",
          "url": "https://www.nhtalkradio.com/?p=27098",
          "publisher": "WKXL",
          "date": "2026-09-05",
          "source_tier": 4
        },
        {
          "title": "Rates and Rights: Don’t panic about that data center in Bow",
          "url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "publisher": "Concord Monitor",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Michael Vose & Glen Lyons: We have a better alternative to a data center moratorium - UnionLeader.com",
          "url": "https://www.unionleader.com/opinion/op-eds/michael-vose-glen-lyons-we-have-a-better-alternative-to-a-data-center-moratorium/article_c2641d8e-2a65-4a14-9a50-baef686bef7d.html",
          "publisher": "UnionLeader.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Letter: Voice your opposition to Bow data center",
          "url": "https://www.concordmonitor.com/2026/09/24/letter-voice-your-opposition-to-bow-data-center/",
          "publisher": "Concord Monitor",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "In New Hampshire, Democrats and Re­pub­licans fight over who is more anti-data center - Spectrum News",
          "url": "https://spectrumnews1.com/ma/worcester/news/2026/09/08/new-hampshire-data-centers-shaheen-pappas-ayotte",
          "publisher": "Spectrum News",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com",
          "url": "https://www.concordmonitor.com/2026/09/04/tax-relief-or-environmental-threat-bow-residents-divided-over-possible-data-center/",
          "publisher": "concordmonitor.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Ayotte opposes potential Bow data center, plans to propose statewide moratorium - mainepublic.org",
          "url": "https://www.mainepublic.org/2026-09-02/ayotte-opposes-potential-bow-data-center-plans-to-propose-moratorium-on-data-centers-in-state",
          "publisher": "mainepublic.org",
          "date": "2026-09-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project",
          "source_url": "https://www.concordmonitor.com/2026/09/24/letter-voice-your-opposition-to-bow-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "A preliminary study will examine the viability of a potential 350 megawatt interconnection associated with Granite Shore Power related to the rumored Bow data center.",
          "source_url": "https://www.unionleader.com/opinion/op-eds/michael-vose-glen-lyons-we-have-a-better-alternative-to-a-data-center-moratorium/article_c2641d8e-2a65-4a14-9a50-baef686bef7d.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Eversource has been in communication with a developer interested in building a data center in Bow",
          "source_url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Data center would be located next to Merrimack Station power plant",
          "source_url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-05",
          "summary": "The project is proposed at the Merrimack Station, a coal fired power plant that ceased operations in September 2025",
          "source_url": "https://www.nhtalkradio.com/?p=27098",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-05",
          "summary": "Granite Shore Power is exploring a 350 megawatt data center project in Bow",
          "source_url": "https://www.nhtalkradio.com/?p=27098",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Merrimack Station, a coal fired power plant, ceased operations in September 2025 and was due for retirement in 2028",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Granite Shore Power owns the 345 acre Merrimack Plant site",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "An unnamed town official in Bow confirmed there were high level discussions with a company about bringing a 350 megawatt data center to the town",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Eversource and Granite Shore Power filed an application to the Federal Energy Regulatory Committee for a viability study for an up to 350 megawatt interconnection at the Merrimack Station coal plant",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "boston-neighborhood-data-center-ma",
      "name": "Boston Neighborhood Data Center",
      "summary": "A data center described by neighbors as a towering dungeon is proposed in a Boston neighborhood, drawing local opposition.",
      "state": "MA",
      "city": "Boston",
      "county": "Suffolk County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.36028,
      "longitude": -71.05778,
      "location_precision": "county",
      "location_source": "County seat (Boston), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/boston-neighborhood-data-center-ma",
      "source": "https://www.nbcboston.com/news/local/data-centers-ai-massachusetts-maura-healey-announcement/4010850/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Healey announces new regulations on data center development in Mass. - NBC Boston",
          "url": "https://www.nbcboston.com/news/local/data-centers-ai-massachusetts-maura-healey-announcement/4010850/",
          "publisher": "NBC Boston",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Boston neighbhorhood frets as towering ‘dungeon’ data center looms over homes - The Independent",
          "url": "https://www.independent.co.uk/news/world/americas/boston-neighborhood-data-center-lawsuit-b2998660.html",
          "publisher": "The Independent",
          "date": "2026-06-18",
          "source_tier": 4
        },
        {
          "title": "‘We’re giving communities a voice’: Healey signs executive order to block new data centers in Mass. unless they have local approval - The Boston Globe",
          "url": "https://www.bostonglobe.com/2026/09/08/metro/healey-data-centers-executive-order-local-approval/",
          "publisher": "The Boston Globe",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Massachusetts Requires Local Approval for Data Centers Under New Executive Order - Boston's ROCK 92.9",
          "url": "https://rock929rocks.com/2026/09/10/massachusetts-requires-local-approval-for-data-centers-under-new-executive-order/",
          "publisher": "Boston's ROCK 92.9",
          "date": "2026-09-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "Servistar Realties proposed constructing a campus of 10 separate buildings requiring 274 megawatts of electricity",
          "source_url": "https://www.bostonglobe.com/2026/09/08/metro/healey-data-centers-executive-order-local-approval/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "The Westfield data center project received some local permits in 2021",
          "source_url": "https://www.bostonglobe.com/2026/09/08/metro/healey-data-centers-executive-order-local-approval/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "Markley Group invested more than 600 million dollars to transform former Prince Spaghetti factory into 14 acre data center campus in Lowell",
          "source_url": "https://www.nbcboston.com/news/local/data-centers-ai-massachusetts-maura-healey-announcement/4010850/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "Markley Group purchased property in 2015",
          "source_url": "https://www.nbcboston.com/news/local/data-centers-ai-massachusetts-maura-healey-announcement/4010850/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "centersquare-boston-data-center-ma",
      "name": "Centersquare Boston data center",
      "summary": "Centersquare lists a data center at Boston, Massachusetts among the sites it operates.",
      "state": "MA",
      "city": "Boston",
      "county": "Suffolk County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 42.3322591,
      "longitude": -71.0164764,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-boston-data-center-ma",
      "source": "https://aimagazine.com/news/how-will-centersquares-1bn-expansion-support-the-ai-boom",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: The US$1bn Expansion Supporting the AI Boom - AI Magazine",
          "url": "https://aimagazine.com/news/how-will-centersquares-1bn-expansion-support-the-ai-boom",
          "publisher": "AI Magazine",
          "date": "2025-10-05",
          "source_tier": 1
        },
        {
          "title": "Brookfield-Tied Data Center Firm Buys 10 Properties Valued At $1B - Bisnow",
          "url": "https://www.bisnow.com/news/national/data-center-capital-markets/brookfield-tied-data-center-firm-spends-1b-in-cash-for-10-properties-131217",
          "publisher": "Bisnow",
          "date": "2025-10-02",
          "source_tier": 1
        },
        {
          "title": "Centersquare Launches $1 Billion Expansion to Scale an AI-Ready North American Data Center Platform - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/colocation/article/55329299/centersquare-launches-1-billion-expansion-to-scale-an-ai-ready-north-american-data-center-platform",
          "publisher": "Data Center Frontier",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Brookfield’s Centersquare acquires 10 data centers in North America in $1bn deal - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/brookfields-centersquare-acquires-10-data-centers-in-north-america-in-1bn-deal/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-03",
          "source_tier": 1
        },
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Boston data center at Boston, Massachusetts on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-norwalk-nym5-ct",
      "name": "CyrusOne Norwalk NYM5",
      "summary": "CyrusOne lists a data center at Norwalk, Connecticut among the sites it operates.",
      "state": "CT",
      "city": "Norwalk",
      "county": "Western Connecticut Planning Region",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 41.0929345,
      "longitude": -73.4194257,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-norwalk-nym5-ct",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Norwalk NYM5",
          "url": "https://www.cyrusone.com/data-centers/north-america/norwalk-ct",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne lists Norwalk NYM5 at Norwalk, Connecticut",
          "url": "https://www.cyrusone.com/data-centers#cyrusone-norwalk-nym5-ct",
          "publisher": "CyrusOne",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "CyrusOne lists CyrusOne Norwalk NYM5 at Norwalk, Connecticut on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers#cyrusone-norwalk-nym5-ct",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-boston-data-center-ma",
      "name": "DataBank Boston data center",
      "summary": "DataBank lists a data center at Boston, Massachusetts among the sites it operates.",
      "state": "MA",
      "city": "Boston",
      "county": "Suffolk County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 42.3322591,
      "longitude": -71.0164764,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-boston-data-center-ma",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Boston data center at Boston, Massachusetts on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "deepgreen-western-passage-underwater-ai-data-center-eastport-me",
      "name": "DeepGreen Western Passage Underwater AI Data Center",
      "summary": "DeepGreen proposed an underwater AI data center off the coast of Eastport, scaled down to 15 MW and a 27.1 acre active infrastructure footprint with 16 turbines in Phase I, and filed a 48 month preliminary permit application with FERC in February 2026, though Eastport enacted a 180 day moratorium on the project in August 2026.",
      "state": "ME",
      "city": "Eastport",
      "county": "Washington County",
      "status": "proposed",
      "developer": "DeepGreen",
      "capacity_mw": 15,
      "latitude": 44.68333,
      "longitude": -67.46667,
      "location_precision": "county",
      "location_source": "County seat (Machias), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/deepgreen-western-passage-underwater-ai-data-center-eastport-me",
      "source": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Residents seek formal role in federal review as Eastport considers ban on underwater data center - The Maine Monitor",
          "url": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
          "publisher": "The Maine Monitor",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Residents seek formal role in federal review as Eastport considers ban on underwater data center - newscentermaine.com",
          "url": "https://www.yahoo.com/news/us/articles/residents-seek-formal-role-federal-180002590.html",
          "publisher": "newscentermaine.com",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "Eastport Council unanimously adopts moratorium on DeepGreen underwater data center proposal - The Maine Monitor",
          "url": "https://themainemonitor.org/eastport-adopts-moratorium-underwater-data-center-proposal/",
          "publisher": "The Maine Monitor",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Needham developer proposes underwater AI data centers off Maine coast - Needham Observer",
          "url": "https://needhamobserver.com/needham-developer-proposes-underwater-ai-data-centers-off-maine-coast/",
          "publisher": "Needham Observer",
          "date": "2026-05-14",
          "source_tier": 4
        },
        {
          "title": "planet maine vol. 36: Eastport’s data center resistance - mainepublic.org",
          "url": "https://www.mainepublic.org/climate/2026-08-26/planet-maine-vol-36-eastports-data-center-resistance",
          "publisher": "mainepublic.org",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "Proposed data center inches closer to reality - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/data-center-pkg-11pm/97-0926871e-90e7-4217-b588-3999af0bbd31",
          "publisher": "newscentermaine.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Eastport united in opposition to underwater data center proposal - Bangor Daily News",
          "url": "https://www.bangordailynews.com/2026/08/11/down-east/downeast-business/eastport-maine-underwater-data-center-proposal-opposition/",
          "publisher": "Bangor Daily News",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Ordinance requiring voter approval for data centers called 'unlawful’ - The Maine Monitor",
          "url": "https://themainemonitor.org/analysis-finds-eastport-voter-approval-data-projects-unlawful/",
          "publisher": "The Maine Monitor",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "Federal regulators accept preliminary permit for underwater data center off Eastport - Bangor Daily News",
          "url": "https://www.bangordailynews.com/2026/08/24/down-east/downeast-government/eastport-maine-ferc-underwater-data-center-preliminary-permit-approval/",
          "publisher": "Bangor Daily News",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Eastport residents seek formal role in federal review of proposed underwater data center",
          "url": "https://www.bangordailynews.com/2026/09/08/down-east/downeast-government/eastport-maine-underwater-data-center-federal-review-public-input/",
          "publisher": "Bangor Daily News",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Proposed underwater AI data center advances in federal review, raising concerns in Eastport - newscentermaine.com",
          "url": "https://www.newscentermaine.com/article/tech/science/environment/proposed-underwater-ai-data-center-advances-in-federal-review-raising-concerns-in-eastport-maine-tech-environment/97-0154c244-4eb6-46f7-865d-2f4d04fb8bde",
          "publisher": "newscentermaine.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Eastport AI data center proposal advances amid local concerns - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/community/eastport-ai-data-center-proposal-advances-amid-local-concerns/97-95fc62cf-8df2-4cf6-a922-be9a6cd9f915",
          "publisher": "newscentermaine.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Eastport underwater AI data center moves forward in federal review - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/community/eastport-underwater-ai-data-center-moves-forward-in-federal-review/97-8380199a-8eab-4e45-909d-65ef61cfea66",
          "publisher": "newscentermaine.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Advisory group asking for public input on future of data centers in Maine - Maine Morning Star",
          "url": "https://mainemorningstar.com/2026/08/25/advisory-group-asking-for-public-input-on-future-of-data-centers-in-maine/",
          "publisher": "Maine Morning Star",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Eastport divided over proposed underwater data center - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/politics/maine-politics/eastport-divided-over-proposed-underwater-data-center/97-f27a4a8f-e9bf-4cc6-aa1d-3cd91b76bb53",
          "publisher": "newscentermaine.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Eastport community is divided over proposed underwater data center - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/local/eastport-community-is-divided-over-proposed-underwater-data-center/97-c439e0ff-d035-4c04-b325-248d67fa11f4",
          "publisher": "newscentermaine.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Proposed Eastport underwater AI data center off coast one step closer - newscentermaine.com",
          "url": "https://www.newscentermaine.com/video/news/local/proposed-eastport-underwater-ai-data-center-off-coast-one-step-closer/97-7df3361d-1c0f-450d-9e8a-bc0f1c1a24c2",
          "publisher": "newscentermaine.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Ordinance that would prohibit DeepGreen data-center project in Eastport scheduled for hearing in August - The Maine Monitor",
          "url": "https://themainemonitor.org/ordinance-hearing-easport-data-center-scheduled/",
          "publisher": "The Maine Monitor",
          "date": "2026-07-17",
          "source_tier": 4
        },
        {
          "title": "Coalition of Eastport residents submits petition to prohibit large data center project - The Maine Monitor",
          "url": "https://www.newscentermaine.com/article/news/regional/the-maine-monitor/eastport-maine-residents-submit-petition-to-prohibit-large-data-center-project/97-c524ec64-55d6-4ad5-94a1-e1e63b52e92c",
          "publisher": "The Maine Monitor",
          "date": "2026-06-26",
          "source_tier": 4
        },
        {
          "title": "Proposed Eastport underwater AI data center advances - WABI",
          "url": "https://www.wabi.tv/2026/08/22/proposed-eastport-underwater-ai-data-center-advances/",
          "publisher": "WABI",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "The One Town That Wants a Data Center - The Atlantic",
          "url": "https://www.theatlantic.com/technology/2026/08/jay-maine-wants-data-center/688043/",
          "publisher": "The Atlantic",
          "date": "2026-08-03",
          "source_tier": 4
        },
        {
          "title": "Proposed Eastport underwater AI data center advances - WABI",
          "url": "https://www.wabi.tv/2026/08/22/proposed-eastport-underwater-ai-data-center-advances/",
          "publisher": "WABI",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "A week after Eastport banned data centers for 180 days, federal regulators accepted the underwater AI project’s application - NationofChange",
          "url": "https://www.nationofchange.org/2026/08/25/a-week-after-eastport-banned-data-centers-for-180-days-federal-regulators-accepted-the-underwater-ai-projects-application/",
          "publisher": "NationofChange",
          "date": "2026-08-25",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "DeepGreen Western Passage SPV LLC applied to FERC in February for 48 month preliminary permit",
          "source_url": "https://www.yahoo.com/news/us/articles/residents-seek-formal-role-federal-180002590.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "FERC accepted DeepGreen permit application for filing in August",
          "source_url": "https://www.yahoo.com/news/us/articles/residents-seek-formal-role-federal-180002590.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Louis Wolfson applied in February to FERC for a 48 month preliminary permit",
          "source_url": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "FERC accepted DeepGreen Western Passage SPV LLC's preliminary permit application in August",
          "source_url": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "DeepGreen Western Passage applied to FERC in February 2026 for a permit to explore putting a data center underwater in Johnson Cove, Passamaquoddy Bay",
          "source_url": "https://www.bangordailynews.com/2026/08/11/down-east/downeast-business/eastport-maine-underwater-data-center-proposal-opposition/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "DeepGreen Western Passage SPV LLC applied for a 48 month preliminary permit with the Federal Energy Regulatory Commission for a tidal powered underwater AI data center",
          "source_url": "https://themainemonitor.org/analysis-finds-eastport-voter-approval-data-projects-unlawful/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DeepGreen proposed a subsea tidal cooled AI data center deployment in Western Passage off Eastport, Washington County, Maine.",
          "source_url": "https://themainemonitor.org/eastport-adopts-moratorium-underwater-data-center-proposal/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-14",
          "summary": "Needham developer proposes underwater AI data centers off Maine coast",
          "source_url": "https://needhamobserver.com/needham-developer-proposes-underwater-ai-data-centers-off-maine-coast/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "digital-realty-needham-ma",
      "name": "Digital Realty Needham",
      "summary": "Digital Realty lists 2 data centers at Needham, Massachusetts among the sites it operates.",
      "state": "MA",
      "city": "Needham",
      "county": "Norfolk County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 42.2813692,
      "longitude": -71.2410826,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-needham-ma",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty BOS14",
          "url": "https://www.digitalrealty.com/data-centers/americas/boston/bos14",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Boston",
          "url": "https://www.digitalrealty.com/data-centers/americas/boston",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty BOS14, Digital Realty Boston at Needham, Massachusetts on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/boston/bos14",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "eastport-underwater-data-center-me",
      "name": "Eastport Underwater Data Center",
      "summary": "Residents are seeking a formal role in the federal review process as Eastport considers a ban on an underwater data center project.",
      "state": "ME",
      "city": "Eastport",
      "county": "Washington County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 44.68333,
      "longitude": -67.46667,
      "location_precision": "county",
      "location_source": "County seat (Machias), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/eastport-underwater-data-center-me",
      "source": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Residents seek formal role in federal review as Eastport considers ban on underwater data center - The Maine Monitor",
          "url": "https://themainemonitor.org/eastport-residents-seek-formal-role-federal-datacenter-review/",
          "publisher": "The Maine Monitor",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "The Maine Monitor. . A group of residents is petitioning the #Maine city of Eastport to enact a permanent ban on #AI data facilities after DeepGreen Western Passage applied for a preliminary permit to test an underwater #datacenter off the city’s northern coast.",
          "url": "https://www.facebook.com/MaineMonitor/videos/a-group-of-residents-is-petitioning-the-maine-city-of-eastport-to-enact-a-perman/1417446923576563/",
          "publisher": "www.facebook.com",
          "date": "2026-07-02",
          "source_tier": 4
        },
        {
          "title": "Eastport community torn on underwater AI data center proposal",
          "url": "https://wgme.com/news/local/eastport-community-torn-on-underwater-ai-data-center-proposal-massachusetts-based-deep-green-environment-marine-life-federal-energy-regulatory-commission-power-gird-quality-of-life-issues",
          "publisher": "wgme.com",
          "date": "2026-07-07",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-07-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-02",
          "summary": "DeepGreen Western Passage applied for preliminary permit to test underwater data center off Eastport's northern coast",
          "source_url": "https://www.facebook.com/MaineMonitor/videos/a-group-of-residents-is-petitioning-the-maine-city-of-eastport-to-enact-a-perman/1417446923576563/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "equinix-bo2-billerica-ma",
      "name": "Equinix BO2",
      "summary": "Equinix lists a data center at Billerica, Massachusetts among the sites it operates.",
      "state": "MA",
      "city": "Billerica",
      "county": "Middlesex County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 42.5586774,
      "longitude": -71.2672638,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-bo2-billerica-ma",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix BO2",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/boston-data-centers/bo2",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix BO2 at Billerica, Massachusetts on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/boston-data-centers/bo2",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "holyoke-paper-mill-data-center-ma",
      "name": "Holyoke Paper Mill Data Center",
      "summary": "A developer plans a $200 million data center at a former Holyoke paper mill, while city councilors are considering a ban on data centers.",
      "state": "MA",
      "city": "Holyoke",
      "county": "Hampden County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.11241,
      "longitude": -72.54745,
      "location_precision": "county",
      "location_source": "County seat (Springfield), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/holyoke-paper-mill-data-center-ma",
      "source": "https://www.masslive.com/westernmass/2026/06/developer-plans-200m-data-center-at-former-holyoke-paper-mill-we-have-the-power.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Developer plans $200M data center at former Holyoke paper mill: ‘We have the power’ - masslive.com",
          "url": "https://www.masslive.com/westernmass/2026/06/developer-plans-200m-data-center-at-former-holyoke-paper-mill-we-have-the-power.html",
          "publisher": "masslive.com",
          "date": "2026-06-02",
          "source_tier": 4
        },
        {
          "title": "Holyoke councilors mull data center ban as developer seeks former complex - WAMC",
          "url": "https://www.wamc.org/news/2026-06-16/holyoke-councilors-mull-data-center-ban-as-developer-seeks-former-complex",
          "publisher": "WAMC",
          "date": "2026-06-16",
          "source_tier": 4
        },
        {
          "title": "Holyoke banned new data centers. But it likes the eco-conscious one it already has - WBUR",
          "url": "https://www.wbur.org/news/2026/09/11/holyoke-massachusetts-ai-data-center-ban-green-center",
          "publisher": "WBUR",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Lessons From Lowell: How a Data Center’s Expansion Has Choked a Small Town - The Harvard Crimson",
          "url": "https://www.thecrimson.com/article/2026/5/5/ai-data-center-lowell-water/",
          "publisher": "The Harvard Crimson",
          "date": "2026-05-04",
          "source_tier": 4
        },
        {
          "title": "At Holyoke site, data center developers point out assets - MassLive",
          "url": "https://www.masslive.com/westernmass/2026/06/at-holyoke-site-data-center-developers-point-out-assets.html",
          "publisher": "MassLive",
          "date": "2026-06-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Facility received highest rating for energy efficiency from U.S. Green Building Council in 2013",
          "source_url": "https://www.wbur.org/news/2026/09/11/holyoke-massachusetts-ai-data-center-ban-green-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-15",
          "summary": "Data center developers are pointing out assets at Holyoke site",
          "source_url": "https://www.masslive.com/westernmass/2026/06/at-holyoke-site-data-center-developers-point-out-assets.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-04",
          "summary": "Data center expansion in Lowell has affected the town",
          "source_url": "https://www.thecrimson.com/article/2026/5/5/ai-data-center-lowell-water/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "jay-data-center-at-former-paper-mill-me",
      "name": "Jay Data Center at Former Paper Mill",
      "summary": "A developer proposed a data center at a former paper mill site in Jay, Maine, which cleared a legislative hurdle in April 2026 but was subsequently put on hold indefinitely after the company withdrew from the project in June 2026.",
      "state": "ME",
      "city": "Jay",
      "county": "Franklin County",
      "status": "stalled",
      "developer": "Sentinel / Tony McDonald",
      "capacity_mw": 82,
      "latitude": 44.66556,
      "longitude": -70.14694,
      "location_precision": "county",
      "location_source": "County seat (Farmington), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jay-data-center-at-former-paper-mill-me",
      "source": "https://www.vermontpublic.org/2026-06-12/developer-halts-plans-for-data-center-at-former-jay-paper-mill",
      "basis": "official_record",
      "sources": [
        {
          "title": "Developer halts plans for data center at former Jay paper mill - vermontpublic.org",
          "url": "https://www.vermontpublic.org/2026-06-12/developer-halts-plans-for-data-center-at-former-jay-paper-mill",
          "publisher": "vermontpublic.org",
          "date": "2026-06-12",
          "source_tier": 1
        },
        {
          "title": "Jay data center on hold indefinitely as company backs out, despite veto of statewide ban - Maine Morning Star",
          "url": "https://mainemorningstar.com/2026/06/18/jay-data-center-on-hold-indefinitely-as-company-backs-out-despite-veto-of-statewide-ban/",
          "publisher": "Maine Morning Star",
          "date": "2026-06-18",
          "source_tier": 4
        },
        {
          "title": "After Mills vetoes statewide pause, Maine towns move to halt data center projects locally - WGME",
          "url": "https://wgme.com/news/local/after-mills-vetoes-statewide-pause-maine-towns-move-to-halt-data-center-projects-locally",
          "publisher": "WGME",
          "date": "2026-06-12",
          "source_tier": 4
        },
        {
          "title": "Maine Legislature passes first in the nation ban on data centers - Vermont Public",
          "url": "https://www.mainepublic.org/climate/2026-04-13/maine-legislature-passes-first-in-the-nation-ban-on-data-centers",
          "publisher": "Vermont Public",
          "date": "2026-04-13",
          "source_tier": 1
        },
        {
          "title": "Weird Town Begs for AI Data Center - Futurism",
          "url": "https://futurism.com/artificial-intelligence/weird-town-begs-ai-data-center",
          "publisher": "Futurism",
          "date": "2026-08-08",
          "source_tier": 1
        },
        {
          "title": "'Incredibly disappointed' - environment group, bill sponsor dismayed at veto of data center ban - vermontpublic.org",
          "url": "https://www.vermontpublic.org/2026-04-27/incredibly-disappointed-environment-group-bill-sponsor-dismayed-at-veto-of-data-center-ban",
          "publisher": "vermontpublic.org",
          "date": "2026-04-27",
          "source_tier": 1
        },
        {
          "title": "Jay data center project at former paper mill put on hold after developer backs out - WMTW",
          "url": "https://www.wmtw.com/article/jay-maine-mill-data-center-on-hold-developer-out/71574086",
          "publisher": "WMTW",
          "date": "2026-06-12",
          "source_tier": 1
        },
        {
          "title": "Sentinel DC backs off paper mill data center project in Maine",
          "url": "https://www.datacenterdynamics.com/en/news/sentinel-dc-backs-off-paper-mill-data-center-project-in-maine/",
          "publisher": "www.datacenterdynamics.com",
          "date": "2026-06-12",
          "source_tier": 3
        },
        {
          "title": "Lure of data center derails needed housing project in rural Maine - Maine Beacon",
          "url": "https://mainebeacon.com/lure-of-data-center-derails-needed-housing-project-in-rural-maine/",
          "publisher": "Maine Beacon",
          "date": "2026-05-28",
          "source_tier": 4
        },
        {
          "title": "Jay data center developer sought to give Janet Mills ‘cover’ for key veto, emails show - The Maine Monitor",
          "url": "https://themainemonitor.org/jay-data-center-developer-cover-mills-veto/",
          "publisher": "The Maine Monitor",
          "date": "2026-07-06",
          "source_tier": 4
        },
        {
          "title": "Jay data center can proceed after clearing legislative hurdle - The Maine Monitor",
          "url": "https://themainemonitor.org/jay-data-center-can-proceed/",
          "publisher": "The Maine Monitor",
          "date": "2026-04-29",
          "source_tier": 4
        },
        {
          "title": "Developer halts plans for data center at former Jay paper mill - mainepublic.org",
          "url": "https://www.mainepublic.org/climate/2026-06-12/developer-halts-plans-for-data-center-at-former-jay-paper-mill",
          "publisher": "mainepublic.org",
          "date": "2026-06-12",
          "source_tier": 4
        },
        {
          "title": "After Maine data center moratorium veto, one project expected to move forward - IT Brew",
          "url": "https://www.itbrew.com/stories/2026/05/04/after-maine-data-center-moratorium-veto-one-project-expected-to-move-forward",
          "publisher": "IT Brew",
          "date": "2026-05-04",
          "source_tier": 4
        },
        {
          "title": "Jay data center project pauses as developer withdraws from former mill site plan - newscentermaine.com",
          "url": "https://www.newscentermaine.com/article/money/business/jay-data-center-project-pauses-developer-withdraws-former-mill-site-plan/97-67a4e89c-dd93-41e4-9cf7-9ba58e747011",
          "publisher": "newscentermaine.com",
          "date": "2026-06-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "stalled",
          "effective_at": "2026-06-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Developers halted plans for a proposed data center campus at the former Androscoggin Paper Mill site in Jay, Franklin County, Maine.",
          "source_url": "https://www.vermontpublic.org/2026-06-12/developer-halts-plans-for-data-center-at-former-jay-paper-mill",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "jay-data-center-me",
      "name": "Jay Data Center",
      "summary": "The town of Jay approved a town meeting warrant backing a data center plan.",
      "state": "ME",
      "city": "Jay",
      "county": "Franklin County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 44.66556,
      "longitude": -70.14694,
      "location_precision": "county",
      "location_source": "County seat (Farmington), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jay-data-center-me",
      "source": "https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
      "basis": "official_record",
      "sources": [
        {
          "title": "Unredacted NDA names Wiscasset’s data center inquirer - Boothbay Register",
          "url": "https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
          "publisher": "Boothbay Register",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Jay approves town meeting warrant, backs data center plan - The Maine Monitor",
          "url": "https://themainemonitor.org/jay-backs-data-center-plan/",
          "publisher": "The Maine Monitor",
          "date": "2026-03-25",
          "source_tier": 4
        },
        {
          "title": "Fiber expansion in western Maine tied to Jay data center project",
          "url": "https://www.sunjournal.com/2026/04/27/fiber-expansion-in-western-maine-tied-to-jay-data-center-project/",
          "publisher": "www.sunjournal.com",
          "date": "2026-04-27",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Boundless Power LLC of Manhattan Beach, California, managed by Fred Robinson, inquired about developing a data center in Wiscasset",
          "source_url": "https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Non disclosure agreement signed August 19, 2025, between Wiscasset and Boundless Power LLC",
          "source_url": "https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Project no longer being pursued as of August 20, 2026",
          "source_url": "https://www.boothbayregister.com/article/unredacted-nda-names-wiscasset-s-data-center-inquirer/273584",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "markley-group-lowell-data-center-ma",
      "name": "Markley Group Lowell Data Center",
      "summary": "Residents sued and a judge halted the expansion of the Markley Group data center in a dense Lowell neighborhood, citing air quality and community impact concerns.",
      "state": "MA",
      "city": "Lowell",
      "county": "Middlesex County",
      "status": "rumored",
      "developer": "Markley Group",
      "capacity_mw": null,
      "latitude": 42.375,
      "longitude": -71.10611,
      "location_precision": "county",
      "location_source": "County seat (Cambridge), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/markley-group-lowell-data-center-ma",
      "source": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Judge blocks installation of additional diesel generators at Lowell data center - NBC Boston",
          "url": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
          "publisher": "NBC Boston",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Lowell Residents Win Stay Against Data Center - Yale Law School",
          "url": "https://law.yale.edu/yls-today/news/lowell-residents-win-stay-against-data-center",
          "publisher": "Yale Law School",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Judge halts data center expansion in Mass. city - masslive.com",
          "url": "https://www.masslive.com/news/2026/08/judge-halts-data-center-expansion-in-mass-city.html",
          "publisher": "masslive.com",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Judge halts expansion of Lowell, Massachusetts data center - CBS News",
          "url": "https://www.yahoo.com/news/videos/judge-halts-expansion-lowell-massachusetts-213600773.html",
          "publisher": "CBS News",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Judge halts expansion of massive data center in Lowell, Massachusetts neighborhood - CBS News",
          "url": "https://www.cbsnews.com/boston/news/judge-halts-expansion-data-center-lowell-massachusetts/",
          "publisher": "CBS News",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Court orders Markley Group to pause expansion of data center in Lowell - WCVB",
          "url": "https://www.wcvb.com/article/markley-group-lowell-generator-plan-lawsuit/73298452",
          "publisher": "WCVB",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "Big tech, residents clash over data centers - Lowell Sun",
          "url": "https://www.lowellsun.com/2026/08/08/big-tech-residents-clash-over-data-centers/",
          "publisher": "Lowell Sun",
          "date": "2026-08-08",
          "source_tier": 4
        },
        {
          "title": "Massachusetts residents ask judge to halt data center expansion in their backyards - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/massachusetts-residents-ask-judge-halt-102800755.html",
          "publisher": "Yahoo",
          "date": "2026-08-02",
          "source_tier": 4
        },
        {
          "title": "Lowell residents sue over data center expansion in neighborhood - WCVB",
          "url": "https://www.wcvb.com/article/lowell-data-center-expansion-lawsuit/71192501",
          "publisher": "WCVB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Residents want a judge to pause Lowell data center expansion - WBUR",
          "url": "https://www.wbur.org/news/2026/07/29/lowell-data-center-massachusetts-markley-group-environmental-justice",
          "publisher": "WBUR",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Lowell residents sue data center, state over air quality permit - CommonWealth Beacon",
          "url": "https://commonwealthbeacon.org/environment/lowell-residents-sue-data-center-state-over-air-quality-permit/",
          "publisher": "CommonWealth Beacon",
          "date": "2026-05-01",
          "source_tier": 4
        },
        {
          "title": "Clinic Lawsuit Challenges Data Center Expansion in Lowell, Massachusetts - Yale Law School",
          "url": "https://law.yale.edu/yls-today/news/clinic-lawsuit-challenges-data-center-expansion-lowell-massachusetts",
          "publisher": "Yale Law School",
          "date": "2026-04-30",
          "source_tier": 4
        },
        {
          "title": "Lessons From Lowell: How a Data Center’s Expansion Has Choked a Small Town - The Harvard Crimson",
          "url": "https://www.thecrimson.com/article/2026/5/5/ai-data-center-lowell-water/",
          "publisher": "The Harvard Crimson",
          "date": "2026-05-04",
          "source_tier": 4
        },
        {
          "title": "Clinic Advocates Against Data Center Expansion in Massachusetts City - Yale Law School",
          "url": "https://law.yale.edu/yls-today/news/clinic-advocates-against-data-center-expansion-massachusetts-city",
          "publisher": "Yale Law School",
          "date": "2026-03-16",
          "source_tier": 4
        },
        {
          "title": "Massachusetts residents sue data center over 27 diesel generators in dense neighborhood - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/massachusetts-residents-sue-data-center-191700105.html",
          "publisher": "Yahoo",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Owner of data centers in Boston, Lowell pushes back against opposition - Boston Herald",
          "url": "https://www.bostonherald.com/2026/09/13/markley-lowell-pushes-back-against-data-center-opposition/",
          "publisher": "Boston Herald",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "Data Center Air Quality Plan Appeal in Lowell, Massachusetts - law.yale.edu",
          "url": "https://law.yale.edu/studying-law-yale/clinical-and-experiential-learning/our-clinics/environmental-justice-law-and-advocacy-clinic/data-center",
          "publisher": "law.yale.edu",
          "date": "2026-01-27",
          "source_tier": 4
        },
        {
          "title": "Lowell residents file Massachusetts’ first lawsuit against a data center - Boston.com",
          "url": "https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/",
          "publisher": "Boston.com",
          "date": "2026-05-07",
          "source_tier": 4
        },
        {
          "title": "In one Mass. city, the fight over a data center has hit a crisis point - WGBH",
          "url": "https://www.wgbh.org/news/local/2026-07-29/in-one-mass-city-the-fight-over-a-data-center-has-hit-a-crisis-point",
          "publisher": "WGBH",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Neighbors are fighting the expansion of an AI data center in Lowell - NBC Boston",
          "url": "https://www.nbcboston.com/news/local/artificial-intelligence-data-centers-lowell/3982471/",
          "publisher": "NBC Boston",
          "date": "2026-07-16",
          "source_tier": 4
        },
        {
          "title": "14-year-old girl removed by police from public Lowell data center meeting - masslive.com",
          "url": "https://www.masslive.com/news/2026/07/14-year-old-girl-removed-by-police-from-public-lowell-data-center-meeting.html",
          "publisher": "masslive.com",
          "date": "2026-07-01",
          "source_tier": 4
        },
        {
          "title": "Lowell Police remove 14-year-old from data center public forum - Lowell Sun",
          "url": "https://www.lowellsun.com/2026/06/30/lowell-police-remove-14-year-old-from-data-center-public-forum/",
          "publisher": "Lowell Sun",
          "date": "2026-06-30",
          "source_tier": 4
        },
        {
          "title": "Take a rare look inside the largest data center in Massachusetts. Neighbors call it \"the dungeon.\" - CBS News",
          "url": "https://www.cbsnews.com/boston/news/inside-lowell-markley-data-center/",
          "publisher": "CBS News",
          "date": "2026-06-22",
          "source_tier": 4
        },
        {
          "title": "A rare look inside the largest data center in Massachusetts - CBS News",
          "url": "https://www.cbsnews.com/boston/video/a-rare-look-inside-the-largest-data-center-in-massachusetts/",
          "publisher": "CBS News",
          "date": "2026-06-17",
          "source_tier": 4
        },
        {
          "title": "Court orders pause Lowell data center expansion - New England News Collaborative",
          "url": "https://www.nenc.news/gbh/2026-08-12/court-orders-pause-lowell-data-center-expansion",
          "publisher": "New England News Collaborative",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Judge halts expansion of massive data center in Lowell, Massachusetts neighborhood - CBS News",
          "url": "https://www.cbsnews.com/boston/news/judge-halts-expansion-data-center-lowell-massachusetts/",
          "publisher": "CBS News",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Court orders Markley Group to pause expansion of data center in Lowell - WCVB",
          "url": "https://www.wcvb.com/article/markley-group-lowell-generator-plan-lawsuit/73298452",
          "publisher": "WCVB",
          "date": "2026-08-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "The air permit was originally approved by Mass DEP",
          "source_url": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "A judge temporarily blocked installation of four new diesel generators",
          "source_url": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Markley Group owns the property and has invested more than $600 million in the project",
          "source_url": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "The company has four generators already installed at the facility",
          "source_url": "https://www.nbcboston.com/news/local/judge-blocks-installation-of-additional-diesel-generators-at-lowell-data-center/3995798/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Lowell residents sued over a data center expansion",
          "source_url": "https://www.wcvb.com/article/lowell-data-center-expansion-lawsuit/71192501",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Residents requested a judge to pause a data center expansion in Lowell",
          "source_url": "https://www.wbur.org/news/2026/07/29/lowell-data-center-massachusetts-markley-group-environmental-justice",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-07",
          "summary": "Lowell residents file Massachusetts' first lawsuit against a data center",
          "source_url": "https://www.boston.com/news/local-news/2026/05/07/lowell-residents-file-massachusetts-first-lawsuit-against-a-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-04-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-30",
          "summary": "A clinic filed a lawsuit to challenge a data center expansion in Lowell",
          "source_url": "https://law.yale.edu/yls-today/news/clinic-lawsuit-challenges-data-center-expansion-lowell-massachusetts",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "tierpoint-boston-ma",
      "name": "TierPoint Boston",
      "summary": "TierPoint lists 2 data centers at Boston, Massachusetts among the sites it operates.",
      "state": "MA",
      "city": "Boston",
      "county": "Suffolk County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 42.3322591,
      "longitude": -71.0164764,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-boston-ma",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Boston - Andover Data Center, TierPoint Boston - Marlborough Data Center at Boston, Massachusetts on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-waterbury-data-center-ct",
      "name": "TierPoint Waterbury Data Center",
      "summary": "TierPoint lists a data center at Waterbury, Connecticut among the sites it operates.",
      "state": "CT",
      "city": "Waterbury",
      "county": "Naugatuck Valley Planning Region",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 41.5582473,
      "longitude": -73.036067,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-waterbury-data-center-ct",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Waterbury Data Center at Waterbury, Connecticut on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    }
  ],
  "grid_region": {
    "code": "iso-ne",
    "label": "ISO-NE",
    "name": "ISO New England",
    "kind": "iso_rto",
    "parent_iso": null,
    "states": [
      "CT",
      "MA",
      "ME",
      "NH",
      "RI",
      "VT"
    ],
    "primary_states": [],
    "price_effect_2025_mwh": 1.28,
    "price_effect_2025_pct": 2.4,
    "price_effect_2028_mwh": 1.71,
    "price_effect_2028_pct": 3.1,
    "own_dc_share_pct": 1,
    "fixed_cost_share": 0.739,
    "wholesale_price_effect_2025": "2.4 percent (+$1.28 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "3.1 percent (+$1.71 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}